Plano plan view of the oval cuzco in which a bridge was built Interchange; project developed in the department of Tacna – Peru
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
compacted until reaching, bituminous mix, cured by flood, by rice fields, concrete:, sidewalk thickness :, ground :, board :, curing :, technical specifications, svt., developed elevation, table wall, handrail, washed stone, grinding, detail of sidewalks, detail of sidewalk, l. p., washed stone floor, compacted level ground, granular material, x – x section, compacted level ground, npt, section and – and, detail of hammers, vertical signal, drain bin, high post, telephone pole, light pole , legend, wall, sidewalk good est., sidewalk est est., berm cº, ramp, secondary curve, primary curve, control point, water tap, number of mzna., edge track, pro cuzco, av. south circumvallation, fongal, brick, caplina, university, agricultural sciences, av. tarapaca, urb. s a n c a r l s s, column, arco aport., av. municipal, channel, faucet, university, garbage, u.n.g.b.g., planimetry, existing, tracks, u. n.g.b.g., existing track, projected, track demolition, existing, prol. cuzco, sidewalk, track, berm, granular base, garden, plant tracks berms, oval cusco, district, province, department of tacna, prof.resp., location :, owner :, referential, esc :, plane :, date :, cad :, aja, lamina, project:, consultant:, construction of overpass in the oval cusco in the district of tacna, tacna -tacna