Rural Electrical Distribution Plan for Fazenda Timpó-Povoado de Angico

Rural medium voltage electrical distribution network plan for Fazenda Timpó-Povoado de Angico project in Xique-Xique, Brazil. The plan details a 13.8kV primary distribution line with 440/220V secondary voltage serving multiple transformer installations (10kVA, 2-phase). Network spans 11.122km with branch lines to six transformer points (labeled I-VI) serving rural consumers. Key components include concrete poles, lightning arresters, grounding systems, and overhead conductors (primary: 2×4CAA). The drawing incorporates topographical data (384-390m elevation range), access roads, and infrastructure crossing points. Design follows COELBA utility standards under contract 4600045066/2017 with safety protocols highlighted. Implementation includes detailed structure labeling and consumer connection points with UTM coordinates for accurate field placement.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
Portuguese
Materials
Steel
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Uploaded by
Engineer K
Category
Water Sewage & Electricity Infrastructure
Published
Apr 3, 2026
Price $12.00
or

or get unlimited access from $7/mo

Browse All Downloads