Wastewater Treatment Plant Piping & Equipment Layout Plan

Project Overview

This as-built construction drawing (“bản vẽ hoàn công”) depicts a comprehensive layout of wastewater treatment plant equipment and piping systems designed by Full Antech Environmental Technology. This drawing includes multiple floor plan layouts showing equipment placement, aeration systems, and detailed pipe routing throughout the treatment facility.

Technical Specifications

Piping System Details:
– Primary piping materials: PVC and stainless steel (SUS-304)
– Pipe diameters range from 3/4″ to 8″ (predominantly 2″-3″ PVC pipes)
– Includes various fittings: 90° elbows, tees, reducers (3″×2″), flanges, and butterfly valves
– Separate systems for water pumping, sludge pumping, and anoxic circulation

Equipment Components:
– Pumps: PM-10(A/B), PM-100(A/B), PM-101A/B, PM-11(A/B), PM-202B(A/B), PM-203, PM-204A/B
– Aeration equipment: AG-104, AG-105, AG-203, blowers (BL-11-202A/B)
– Chemical dosing systems: tanks for NaOCl, NaOH, H₂SO₄, PAC, and polymer
– Fine screen filter system (“lược rác tinh”)
– pH monitoring (pH-12, pH-102)
– Sludge press (“máy ép bùn”)

The layout demonstrates careful attention to spatial constraints, with equipment arranged to optimize operational efficiency while maintaining accessibility for maintenance. Notably, the aeration piping layout shows strategic distribution of diffusers to maximize oxygen transfer within treatment tanks.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
Arabic
Materials
Plastic, Steel
Units
Metric
Area
500 – 999 m² (5382.0 – 10753.1 ft²)
Uploaded by
Engineer K
Category
Water Sewage & Electricity Infrastructure
Published
May 9, 2025
Price $12.00
or

or get unlimited access from $7/mo

Browse All Downloads