Accessibility Human Figure Blocks with Wheelchairs and Walkers

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Berlin Hauptbahnhof Ground Floor FREE Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Ground floor NW plan for the Berlin Hauptbahnhof Bügelbauten. Free – Add to Cart Checkout Added to cart 4BHK Residential House Floor Plan and Site Layout Detail PREMIUM$3.17 […]

Flanders Remote I/O Module M02 Node 13 Connection CAD Plan

PREMIUM$6.17

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Connection diagram for Flanders Remote I/O Module M02 (Node 13). incl. wiring for inclinometers, vibration sensors, pump temps, […]

or

Motorola ACE3600 RTU Expansion Cabinet Constructive & Connection Detail DWG

PREMIUM$6.17

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings constructive & wiring diagrams for Motorola ACE3600 RTU expansion in 2200x800x800mm IP-rated enclosure. incl. GA views, internal mounting […]

or

Ground Floor & Parking Layout CAD Plan for Residential Building

PREMIUM$2.83

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Ground floor layout incl. entrance hall, elevator lobby, and detailed parking garage arrangement. Includes single & double parking […]

or

Nanjing Delong slaughterhouse layout

PREMIUM$5.95

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Floor plan for Nanjing Delong 100 cattle and 300 sheep production line. Covers slaughtering hall, deboning workshop, and […]

or

Two-Story House Plan with Garage and All Elevations

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Floor plans for both levels plus four exterior facades. Level 1 includes a 2-car garage, kitchen, and a […]

Office Floor Plan

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings office floor plan. includes stairs, lifts, restrooms & a big meeting area.

Flanders Autonomous Drilling M03 Module Wiring Detail DWG

PREMIUM$5.99

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings wiring schematic for the Flanders PZ35 autonomous drilling system M03 module. we’ve included node 17 connections for jack […]

or

Centering Ring Section Detail DWG for SAE-1045 Steel

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Centering ring detail for industrial mold design. Includes a full section A-A with dimensions for diameters, angles (40°, […]

Access Floor Formwork Plan DWG

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Formwork layout for access floor ceiling (Bloco 2) incl. beam/column details and Section A-A. Concrete fck = 25.0 […]

Expanded floor plan for Hemisphere luxury apartment towers

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings incl. suites, gourmet terrace with pizza oven and living zones… planta ampliada

2D Elevation Lighting Collection: Chandeliers, Pendants, and Ornate Street Lamps

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Elevation blocks for interior & exterior lighting fixtrues. Collection includes various chandeliers, pendants, wall sconces, and task lamps. […]

VALE EFC Railway Expansion Plan

PREMIUM$5.95

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Signaling and fiber optic layout for EFC segment 45-47 expansion. Includes Patio 46 and 47 details, backbone routes, […]

or

Medical Clinic and Residence Floor Plans CAD Project with Schedules

PREMIUM$3.99

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Ground and upper floor layouts for a mixed-use clinic and residence. Includes the door & window schedules, accessibility […]

or

24 Unit Residential Apartment Building Project DWG with Sections

PREMIUM$4.95

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Architectural set for a 24-unit apartment building including basement parking and shelter. It includes site plans, all floor […]

or

Mechanical and plumbing legend for University of Alberta Chemistry West Building

FREE

Daniel 588 Drawings · Joined April 2026 Drawings by Daniel 588 Drawings Standard MEP legend including HVAC ductwork, laboratory piping (LOXY, LNIT, LAR), and plumbing fixtures