Piping layout for a tank farm terminal showing the routing to Manifold-F and tanks 1, 2, 3, 6, and 7. Included are bund wall layouts, 42″ main piping, and some detail on existing vs new routing. its got trench elevations based on NAP levels, plus some Dutch notes on tank settlement and water testing. Scale 1:10 location plan included.