It is a design of metal bridge with a length of 90 ML WITH THE DISTRIBUTION OF hangers
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
beam metal arch, v-rig, contraflecha, start, left abutment anchor, right abutment anchor, pedestrian protection barrier, orme ñ o, date :, scale :, description, date, revisions, approval :, drawing :, revision :, specialist:, head study:, district of Huaraz – Ancash, technical file, Antonio Raymondi, construction of the bridge, provincial municipality of Huaraz, Huaraz-Ancash-Peru, Arqº Manuel Orlando alvarado island, JDH, Ing., title, Eng. edwin gamarra