Erdemli – Anamur State Road Sebze Hali Junction Project Plan and Profile

Plan and profile for the Sebze Hali intersection on the Erdemli – Anamur state road. Incl. typical cross-sections for junction area & connecting roads, longitudinal profiles with grade levels, drainage culvert locations, etc. Drawn for the Turkish Highways 5th Regional Directorate.

FREE

File Details

File Type
DWG
Type
Full Project
Language
Spanish
Materials
Concrete, Masonry, Steel, Other
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Uploaded by
DWG Master
Downloads
2 downloads
Category
Public Facilities, Roads, Bridges and Dams
Published
May 8, 2026

Download faster, ad-free, with more daily files from $7/mo

Browse All Downloads