Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Foundation Stakeout And Pilars–Multifamily Solar Powered Edifice DWG Block for AutoCAD

Paths and skateout of foundation ; pilars and solar plurifamily building

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

room, technical school of alicante technical architecture, subject:, final career project, student:, rubén rosemary, group number, date, scale, plan number, flat:, solar set out, symbology installation plumbing, cold water faucet, hot water faucet, flying saucers, a.c.s., a., general tap, cold water faucet, hot water faucet, Heater, a.c.s., antiariete device, symbology installation plumbing, division accountant, meter battery, antiariete device, filter, cold water faucet, flying saucers, a., take collar, general wrench, cold water faucet, non-return valve, pressure relief valve, faucet faucet faucet, supply network, non-return valve, motorized pressure switch, distribution panel, pasatubos by basement wall, feed tube below forged, street elevation, street elevation, pire garcia, floor coverings, ground floor, low level, basement, quota in the area of ​​water reservoirs, steps of, cm., extinguisher, ef., elevator, steps of, cm., extinguisher, ef., steps of, cm., extinguisher, ef., steps of, cm., extinguisher, ef., steps of, cm., extinguisher, ef., steps of, cm., steps of, cm., a.r.m. m., ramp, quota in the area of ​​rooms of c.luz c.agua, extinguisher, ef., extinguisher, ef., ramp, section, facilities, ramp, basement, length of evacuation path, effectiveness, length of evacuation path, pedestrian exit, red extinguisher of kg., effectiveness, initial solar, final solar, foundation, ground clearance for pressure zone drinking water tanks, start, stairs, start, ramp, wall shoe interruption, continues under quota, recreated corner brace, lift, shoe under elevator slab, reinforced concrete slab lift, brace up to dimension, elevator floor, ramp, pressure group, potable water tanks, basement, length of evacuation path, pedestrian exit, effectiveness, red extinguisher of kg., effectiveness, length of evacuation path, facilities, mm tubes for t.t., mm tubes for l.s.m.t., mm tubes for l.s.b.t., mm tubes for c.g.p, mm tubes for c.a., perimeter pillars, on coronation beam, of screen wall, polygon of stakeout of central pillars, parallel to the perimeter, this pillar does not appear on higher floors, I thought I omitted it, axis, pillars, technical school of alicante technical architecture, subject:, final career project, student:, rubén rosemary, group number, date, scale, plan number, flat:, redevelopment

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots Missing Attachment
File Type dwg
Materials Concrete
Measurement Units
Footprint Area
Building Features Elevator
Tags , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT