Kanpur Metro tunnel Section Plan with Cut & Cover and UG Ramp Transitions

This civil engineering drawing illustrates the tunnel design and alignment for the Kanpur Metro project, featuring multiple transitions between elevated, cut & cover, and underground sections. The longitudinal profile shows vertical alignment with precise elevations ranging from 107m to 143m, with critical transition points at chainages -290.000 (start of elevated), 0.000 (start of cut & cover), and 500.000 (start of UG ramp). The drawing details underground stations at Rawatpur (CH 1012.70), Kakadeo (CH 1940.70), and Double Pulia (CH 3149.30). Key infrastructure elements include 800mm diameter piles, 500mm thick RCC walls, drainage sumps at various chainages, and specific horizontal curve radii ranging from -1250m to 2200m. The design accommodates both up and down line tracks with carefully engineered grade transitions and clearances for urban integration.

PREMIUM

File Details

File Type
DWG
Type
Section
Language
English
Materials
Concrete, Steel
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Uploaded by
DWG Models
Category
Roads, Bridges and Dams
Published
Apr 4, 2025
Price $15.00
or

or get unlimited access from $7/mo

Browse All Downloads