Plan to which all civil and electrical works necessary for the construction of an oil platform, with its various ancillary works such as; Poza Sludge; Poza de Agua; Poza Fat; Poza Burn, chemical storage; Cellar Metallic (where is located the rig later), all these works taking into account the preservation of the environment so as will the use of geomembrane to cover all the ground is indispensable.
Drawing labels, details, and other text information extracted from the CAD file:
reference drawings and documents, description, number, original file:, scale:, job, helipuerto, almacen de quimicos, pat, t.g., talud de corte, pat, g.p.s., poza sismica, cubeto de, acceso, campamento, banqueta, pasarella, combustible, lìmite de plataforma, quebrada, pit de bomba, tuberia pvc sap, tuberia pvc enterrado, trampade grasa m., puente, ingreso