Project showing section and plant of road work
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
well bm, ditch, sidewalk, esq, pole, lim, com, ramp, esqochavo, esq, alcanta, ng, area not intervened, concrete gutter, green area, ramapa for the disabled, gardener, concrete baden, construction of sidewalk, sardinel, av costanera south, entry of vehicles, vehicular ramp, vehicular ramp type i, vehicular ramp type ii, ground level, ground level, height of court, slope, slope, level ground, progressive, height fill, height, height, razante, terrain, cut, fill, section i, section ii, longitudinal profile