It is a reservoir of 5m3
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Reservoir supported, National social compensation fund, presidency of the Republic, design:, flat:, draft, drawing:, date:, mole.:, scale.:, reviewed:, Indicated, sheet:, National social compensation fund, presidency of the Republic, fist, Dist, fist, Dpto .:, Prov .:, Chuck, Drinking water system, Ing. Moises arias n., may, C.cotrado, Approved, Description, Rev, Zone, Date, Revisions, Valve stand, Proy. metal lid, mailbox, steps, plant, Roof slab reinforcement, Background armor, Tube projection, Ventilation of, mailbox, your B. Ventilation with grille, Protection at the output, Waterproofing plaster with mortar, Sika no Mortar sika no., Pressed with pure cement sika no., Mortar to give the, Earring background, water level, cut, Fc, Fy, Specifications, Overlaps, Armor weight, Type plane, M. M., Metal sanitary cover, Esc:, Valve stand, Proy. metal lid, mailbox, steps, plant, Roof slab reinforcement, Background armor, Tube projection, Ventilation of, mailbox, your B. Ventilation with grille, Protection at the output, Waterproofing plaster with mortar, Sika no Mortar sika no., Pressed with pure cement sika no., Mortar to give the, Earring background, water level, cut, Fc, Fy, Specifications, Overlaps, Armor weight, Type plane, M. M., Metal sanitary cover, Esc:, made by:, reviewed by:, Reservoir, Location:, flat:, flat, scale:, date:, draft:, August, Indicated, region, province, district, location, Huancane, fist, Drinking water system, Happy mothers, Lizani Pampas, L., bias. Lizani pampa