CAD Workshop
Drawings by CAD Workshop
512 DrawingsMetal Grating Panel CAD Detail for Industrial Access
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Admiralteystvo Hydrographic Survey FREE CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings bathymetric survey showing depth points and isobaths. Free – Add to Cart Checkout Added to cart Apartment Floor Plan CAD Drawing with Room Dimensions FREE […]
Comprehensive collection of electrical schematic symbols and circuit components
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Comprehensive library of 2D electrical symbols for schematics and power diagrams. It features wide range of […]
Enlarged Fire Extinguisher Location Plan for Charlotte Convention Center
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Enlarged floor plan for the Charlotte Convention Center showing fire safety equipment placement. Includes footprints for […]
Hull Lines Plan for 14000DWT Oil and Chemical Tanker
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Hull lines plan for a 14000DWT oil and chemical tanker. Includes the profile, half-breadth and body […]
Complete Two-Story House Architectural Plans and Structural Reinforcement Details
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Full residential project for a house in Phu Tho, Vietnam. Includes detailed architectural layouts for Tầng […]
Post-tensioned ground floor slab reinforcement details with drop panels
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Structural reinf. details for a PT ground floor slab including typ. drop panels and pour strips. […]
Greenworld Landscape Drafting Standards
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings CAD standards sheet including layers, symbols, and a park plan.
Fazenda Lagoa Phase 1 Urban Site Plan with 300m² Residential Lots
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Detailed urban layout for residential subdivision including topographical contours, road network and utility easements (DNIT). Text […]
Ornate Art Nouveau Style Double Wooden Door with Sidelights
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Ornate entry door elevation with art nouveau scrollwork. Includes the double doors, matching sidelights and the […]
Apartment typical unit plans with electrical & hydraulic layouts
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Typical layout for units in a high-rise tower. Covers electrical points, plumbing, & masonry mods for […]
Survey plan for a land claim in Blumenau SC
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Land survey for usucapião process basically shows dimensions, UTM coordinates and neighbors. 412m² plot area, incl. […]
Mixed-Use B+G+5 Residential Project Plans Sections and Details
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Architectural set for a B+G+5 mixed-use building in Kadıköy, including floor plans, sections, and wastewater (atık […]
Electrical renovation project for multi-story residential building with grounding details
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Electrical renovation and grounding project for a multi-story residential building including basement through attic floor plans. […]
Multiple Suspended Gypsum Ceiling Section and Cove Lighting Details
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Ceiling section details for various suspended gypsum board configurations. Includes typical arrangements for indirect cove lighting, […]
Basement Floor Plan and Framing Details for House Addition
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Basically just the basement plan and some structural framing notes.
Art Gallery Electrical Engineering
CAD Workshop 512 Drawings · Joined April 2026 Drawings by CAD Workshop 512 Drawings Electrical & data engineering for art rooms incl. lighting, outlets, schedules, etc, planos de ingeniería eléctrica […]