Mixed-Use B+G+5 Residential Project Plans Sections and Details

Architectural set for a B+G+5 mixed-use building in Kadıköy, including floor plans, sections, and wastewater (atık su) layouts. Features a 76.63 m² footprint with shop levels and residential units, including detailed elevator shaft specs and net area calculations. Istanbul Kadıköy Rasimpaşa mahallesinde yer alan betonarme karkas yapı projesi.

PREMIUM

File Details

File Type
DWG
Type
Full Project
Language
Other
Materials
Concrete, Steel, Masonry
Units
Metric
Area
50 – 149 m² (538.2 – 1603.8 ft²)
Features
Elevator
Uploaded by
CAD Workshop
Category
Condominium, Residential
Published
May 15, 2026
Price $4.67
or

or get unlimited access from $7/mo

Browse All Downloads