Cross section & geogrid arrangement for a 9m high reinforcement embankment protecting steam pipes. Specu0027d with ACEGrid GG 110-I at 0.25m/layer and 95% Modified AASHTO compaction for filling. Includes barrier rail, 30-50cm drain material, and subgrade profile for 35cm thk. pavement.