Design to construction discharge of boxcars tanks and cisterns of Diesel Oil-.With systems Smith Meter Prime 4 and electro bombs 600 GPM each one
Drawing labels, details, and other text information extracted from the CAD file:
no., apr, date, revision, rev., drawing no., job no., scale, approved, checked, drawn by, date, eng. record, as noted