Multifamily Project Plans DWG Full Project for AutoCAD

Municipal plans multifamily housing. Plants; instalacioes; cuts. It includes 6 studio apartments arranged in the same building. Each has approx 30m2 .

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

sight title, ground floor, first floor, studio, bathroom, cairn found, projection cantilever, patio, note: during the survey the foundation was found up to level of chained. the dimensions were consulted with the constructor., sheet of lighting and ventilation, local, area, lighting, ventilation, observations, coef., nec., proj., semicubier., designation, cover, subtotal cover, total partially covered, total covered, sidewalk with non-slip screed, general floor, public road, roof plant, silhouette and balance of surfaces, glazed ceramic floor to choose., leveling folder with water repellent: dosage according to brand., front view, cut bb, cut aa, under table . material to choose.-, dividing axis, ltm, base masonry run., bª: steel bacha, iº: toilet to pedestal, lº: lavatory to pedestal, cs: service tap, llp: stopcock, cv: pipe ventilation, bi: manhole, dª: shower, regulation water meter, stopcock, llp, lamp holder, grounded outlet, lamp holder: type wall arm, main board, sectional board, meter regulatory, references:, combined key, sanitary installation, electrical installation, owner, project, calculation, direction, execution, approval, location, plot, lot, surfaces, to build pb, to build semi covered pa, existing, land, free, total to build, to build semi covered pb, to build pa, martin guemes, marcelo t. of alvear, sto. cabral, urquiza

Raw text data extracted from CAD file:

FREE

File Details

File Type
DWG
Type
Full Project
Language
Spanish
Materials
Masonry, Steel, Other
Units
Metric
Features
Deck / Patio
Uploaded by
Startland Construction
Downloads
2 downloads
Category
Condominium
Published
Dec 16, 2017

Download faster, ad-free, with more daily files from $7/mo

Browse All Downloads