THIS HALL IS A NEW PROJECT FOR THE POLYTECHNIC SCHOOL OF Huancayo – Junín
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
hallway, staircase, court b-b, office, computer, c.t.a, deposit, mec. production, hall, ss.hh, cut a – a, painted, masonry, tarrajeado, ceiling projection, beam projection, sanitary intalaciones duct, cement screed, cut cc, board with forge, second level new pavilion, laboratory , electricity, electricity, audiovisual room, practice workshop, concrete floor, polished and burnished, control room, automatic, ceramic floor, classroom electricity, machines, control, mod. instalac., estar, patio, serv., dormit., dilatacion board, instuct duct. electrical, third level new pavilion, laboratory c.t.a, production, and maintenance, maintenance, mobiliairo, repaired, bench and adjustment, non-slip ceramic floor, room, mechanical classroom prod., s.h. students, catwalk, sshh prof., platform, second level projection, s.h. discap., cistern tank, first level new pavilion, east elevation, north elevation, inst.sanitarias duct, control, duct, tank, elevated, cat type, sidewalk, coverage, polycarbonate, workbenches, staircase, existing , of limp.