Schemes water reserve one with a tanker and 4 elevated tanks with their respective centrifugal pumps
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Management of school infrastructure projects, from Buenos Aires, General education culture, Direction of school infrastructure projects, Provincial management of school infrastructure district management, General direction of culture education, Buenos Aires province, Elastic seal, Hp, V. R., C. P.p. C., T.r. C.h. chap., V.esf.br. Cr., C. P.p. C., V.esf.br. Cr., Hp, C. P.p. C., V.esf.br. Cr., Floating high pressure, C. P.p. C. Current water supply, C. P.p. C., C. P.p. C. Of tque tank, V.esf.br. Cr., V.limp., V. Limp, V.esf.br. Cr., R. V., T.r. L. existing, Collector c.p.p. C., You., Food tque. reservation, automatic, T.r. L. existing, 11. P. Total in p.p. C. kind, Management of school infrastructure projects, from Buenos Aires, General education culture, Direction of school infrastructure projects, Provincial management of school infrastructure district management, General direction of culture education, Buenos Aires province, Elastic seal, Hp, V. R., C. P.p. C., T.r. C.h. chap., V.esf.br. Cr., Hp, C. P.p. C., V.esf.br. Cr., Floating high pressure, C. P.p. C. Current water supply, B.c. P.p. Scaffolding, B.c. P.p. Cooking food, C. P.p. C. Of tque tank, V.esf.br. Cr., V.limp., V. Limp, V.esf.br. Cr., R. V., T.r. L., You., Food tque. reservation, automatic, 11. P. Total in p.p. C. kind, V.limp., T.r. L., B.c. P.p. Scaffolding, V.limp., V.esf.br. Cr.