SEWER INSTALLATION OFFICE BUILDING
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
access, surveillance, project :, location :, scale :, observations :, date :, various states of the country, direction of agricultural infrastructure and technological innovation, cva pedro camejo, project management and infrastructure, flat number :, washing ramp plane , content :, indicated, vertical cut, gravel, entrance to the sump, entrance to the sump, concrete, cover mouth of visit, detail plan of sumps, section cc, cleaning chamber, concrete wall, floor slab, ceiling slab, manhole, tank, protection, curb, flat tank is underground water, flat tank is underground water and details, detail and section of cleaning caps, visitor caps, entry, exit, ventilation, exit ventilation, view floor, tops cleaning, top view, tapas section, the palmita, edo. cojedes, tanquilla details, this type of tanquillas will be used for the different needs of the project