GENERAL PLANT, CUT AND LIFTS THE GROUND TERMINAL TRUJILLO
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
magnetic, nm, retendeembarque, property limit, current property limit, projection of future checkpoints, not part of the file, omnibus income, bus departure, service exit, service income, communications mailbox, slow, pedestrians , electric mailbox, taxi stop, bus stop, north pan-American avenue, metal fence, new wall, entrance path, existing slab level, future track level, sewage treatment plant, parking administration, parking, existing building, zonededesembarqueque, zonadembarque, disembarkation room, VIP boarding, entry of passengers, consignment, delivery of luggage, telephone, served, reception of offices, kitchen, deposit, projection coverage, pit, external column axis, coverage projection, waiting room , comunicac. and data, electrical boards, dep., counter, store, cafeteria, telef., control, taxis, limp., garden, data center, energy, police, diaper, hall, ticket booth, hall slogan, topic, wait, group Electrogen, sub station, board room, extraction equipment, yard, pole, biodigester, sshh, sidewalk, taxi departure, departure of private cars, taxi entry, entry of private cars, iron column axis, grid, hydrant , taxi boarding, internet and, disembarkation room, boarding board, trolley, disembarkation corridor, disembarkation platform, luminous sign, installation trays, runway, landing block, thermoacoustic cover, false ceiling, proy. level of installation, thermic acoustic cover, vip boarding room, farm land, perimeter wall, gci, column top, ridge top, post height, flight height, penthouse completion, existing sidewalk, main entrance path, edge of path, main elevation, rear elevation, entrance hall