Intermission anchorage of wall manufactured in two phases with beam
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
variable, beam, of stirrups according to calculation., Earth, armed wall, casting board, before straining, clean saturated with water, variable, This type of solution is suitable when the excavated terrain remains vertical without danger., intermediate link in a wall built in two phases with a beam