Fire fighting system plan for a mosque building within a factory complex in Al Kharj, Saudi Arabia. The rectangular mosque structure features a main prayer hall with ablution/washing facilities and toilet rooms along the right side. Key elements include:
Fire Protection Components:
– Fire hose cabinets (FHC) with 30m hose reels positioned at strategic locations
– Fire fighting pipe network with 2½” FF main supply line
– Valve box installation for system control
Building Dimensions:
– Prayer hall approximately 14.5m × 9.8m
– Building elevation at +0.30m
– Structured with a grid system of columns at regular intervals
– Entrance located on the east side with ablution facilities adjacent
The plan complies with NFPA standards as indicated in the drawing notes section, with black steel SCH 40 pipes specified for the fire fighting system. The design incorporates proper drainage provisions and includes appropriate testing requirements for the installed system.