The project has a first distribution; second level including a basement. it to be located in an area where the topography is steep
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
up, corridor, natural terrain, cl., proy. lightened, banked beam, room, dining room, kitchen, ss.hh, hall, bar, low, sidewalk, duct, metal railing, balcony, living, study, empty, proy. transparent roof, terrace, ca. arequipa, tarred and pantaro wall, roof, proy. cantilever, teatina: for stair lighting