Industrial site plan and equipment layout for a large-scale beverage bottling facility. The drawing provides a detailed footprint of the production floor, including specific zones for specialty lines, canning, and dropper-style packaging. It shows the precise placement of conveyors, filling machines, and labeling equipment integrated with warehouse storage featuring high-density pallet racking.
External components include a truck parking lot with angled bays, loading docks, and a dedicated water reservoir or tank farm section. The layout includes support areas such as a driver lounge and a panel room. This 2D drawing covers an area exceeding 5,000 square meters, detailing the logistical flow from raw materials and liquid storage to finished product storage and shipping. Implantação e layout de equipamentos para fábrica de bebidas.