Multi family building – 3Plants – 2 appartments by plant – 3 Bedrooms – Electric and phone details
Drawing labels, details, and other text information extracted from the CAD file (Translated from Portuguese):
area service, staircase, living room, bathroom, bedroom, living room, kitchen, circul., balcony, staircase, hall entrance, projection pav. upper floor entrance hall garage slab waterproofed living room dining room living room circulation bath walk pedro cola castle river low floor ground floor plan cover plan longitudinal section bb, cross section – aa, front facade, pedro cola highway, cx. of the can, meters, escelsa, post of, general frame of loads, branches and protection, feeder, general of the building, sizing of the general key until the bus, lamps, sub. total, conditioning, outlets, shower, motors, conduit, disj. ,,,,,,,,,,,,,,,,,,,,,,,, demand, motors, light and outlets, shower, bus, incandescent, fluorecent, shielded, d mm, life, danger, general, key, derivation, box, med. service, condominium, entrance, fire, in case, hang up, no, white letters, red color, bus box, danger of life, consumer conduit, qd bus. of measurement, biphasic, service, fuzible, ground, three-phase, wrench, single phase, seen:, copperweld rod, earthworm, water tank, machine house, apt., apt., bus, box, box passage, masonry, street level, basement, terrace, cx. passage, river castle, pole, detail of the meters, derivation branch of serviso, detail grounding of the lightning rod, plant situation, cut a – b, low voltage subway, passing box masonry, with crusher drem, earth rod , with concrete cover, glazed earthenware, radial, tip, insulator, clamp, floor plan, b. rec, service charge chart, qdc single line diagram, single line diagram, disabled, its removal without the use of appropriate tools and persons, notes: the various pieces must be welded together by pomelos., the box after the pickling shall be painted with a coat of paint, antiferrous, and bluish gray in color., the bushings and electrodes shall be provided with devices to prevent, – indication of falling pipe, – neutral wires, phase, return, bell, antenna and earth – Double switch – Single switch – Triple switch, legend, – Distribution box, – Indication of rising, circling, lamp, incandescent, fluorescent, load, driver, phase, load frame , total, a.rec., of service, walk, light blue color, name and number with black enamel paint, identification of the building in the conduit, unit, description, item, long curve of galvanized iron or pvc, always fill according to calculation s, list of material, escelsa energized, in the extension of the envelope, concrete layer, cut aa ‘, when they are of heavy rigid pvc or fibro- cement, they must be, contain inscription painted red service key and emergency , and the same must be painted red and the inscriptions in white color, the right of who looks at the meter, and the electrodes, inscriptions in case of fire do not turn off in white color, be identified with name of the building and the numbering thereof with black enamel paint, shall be written next to the drawing of the detail of the derivation of the underground entryway, by the interested party at the escelsa office, at the time of the launching of the entryway, general protection of the consumer., open the fuse holders must be without voltage., three single-pole circuit breakers mechanically coupled, self-melting mass, busbar measurement, dimensions, area – mm, tinned copper rods copper rod, welded screw on plate, conduit input conduit, appropriate connector, terminal, sizing of building entrance branch, rod. fued nemer, living room, kitchen,. service, hall, balcony, bedroom, á. service, telest pole, building block, building, post public, iron pipe, pvc conduit, cx. distrib. general, cap, pipe. outlet, drain, pipe. entry, telest, piping, inlet, inlet pipe, general distribution board, grounding pipe, ground rod, width, length, height, depth of distribution boxes, use of tinned wire, any tabulation can only be in the upper and lower tops, fasten the cables to the sides of the enclosures with iron clamps, galvanized, notes :, center to the finished floor., of the adjacent building., in all rigid pvc pipes must be passed and All the primary and secondary piping shall be in rigid pvc with the connections, the diameter specified in design refers to the inner part of the piping., in the carton of the dg. should be installed the casdastro of the internal network, the box of passes