Construction details – detached house foundations; retaining wall; shoes; pedestal; columns; reinforced concrete beams.
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
v.r., pedestal, beam girder, vacuum, column, mezzanine slab, foundations and braces girder, first level, v esc, beam mooring, beam esp, cover machimbre and tile, roof slab, v. mooring, retaining wall, beam load ve-b, projection shoe wall, the c-axis shoes will be fused with the, retaining wall shoe, room, dining room, kitchen, main room, arrival hall, services, patio, drying, bathroom, parking, service to, ladder, elevated tank, base projection