Two-Story Residential Architectural Project Plans and Elevations

architectural set for a 236m² two-story residence. incl. ground and upper floor plans, sections AA/BB, elevations, and site layout with drainage. finishes like porcelain and timber are spec’d in the schedules.

FREE

File Details

File Type
DWG
Type
Full Project
Language
Portuguese
Materials
Wood, Glass, Masonry, Other
Units
Metric
Area
150 – 249 m² (1614.6 – 2680.2 ft²)
Features
Garage, Parking, Garden / Park
Uploaded by
Plan DWG
Downloads
3 downloads
Category
House, Residential
Published
Jun 3, 2026

Download faster, ad-free, with more daily files from $7/mo

Browse All Downloads