Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

8pulg Pipe Step 10 And 20 Meters DWG Block for AutoCAD

This is an adaptation of step 8inch pipe. for spans of 10 and 20 meters

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Collegiate, designer, Department, community, Department:, community:, municipality:, municipality, date, sheet:, date:, Indicated, scale:, sheet, total, Collegiate, reviser, Z street Utatlan, Tel., High tank, Step hanging of meters for pipe, symmetrical, Schematic of transverse tensors, Concrete, Concrete, Tensioner detail, unscaled, Gag should be as close to the guard, Improved steel core steel, Anchorage, More string, Column cable support, unscaled, Tube suspension detail, unscaled, Clamp the closest to the cable, Clamp the closest to the cable, Pvc according to diameter, According to diameter, Clamp the closest to the cable, Tube suspension detail, unscaled, detail, elevation, unscaled, Anchorage, Corrugated f and ksi, tensor, Improved steel plow steel, Of the bridge, Column structure, unscaled, Shoe plant, unscaled, Of the bridge, Cables, cable, reinforcement, In bz, In lz, reinforcement, Pipe diameter, Union dresser, tensor, Tight clamp, Gag, Guardsman, Hg tubes according to diameter, Suspension cable, Tight wire, description, do not., quantity, length, Concrete: Concrete with compressive rupture force will be used, Of the days for the casting of the columns, Shoes, Reinforcement steel: grade reinforcement will be used, Wire rope: improved plow steel wire composed of, Cord cords with steel core with a diameter according to, For each use., The foundation level of the shoes must be the same for both columns, These last will be perfectly aligned with the respective dead., The structure has been calculated for a soil whose support capacity is not, Less than tons per square meter., The overlap in the shoe columns will be cm. respectively, This will be measured between the face of the bar concrete surface., The splicing jaws should be positioned so that the base of the jaw, Is in contact with the cable extension., The air passage has been designed for the exclusive use of the passage of the pipe., The anchor hooks should be applied two hands of paint, Corrosion inhibitor., All dimensions given in meters., All ends of the cable should be protected with, Galvanized wire., If the land has the location of the dead will be defined, Considering that the cable has an inclination with horizontal vertical relation., General notes, to. materials, B. various, Suspension cable, Hg de, double bed, Concrete wall cycle, Of the natural terrain, Neoprene for pipe protection, Moderate energy dissipation capacity fy group use mpa meet ntc fy mpa meet ntc concrete f’c mpa meet nsr live load pa design can not be embedded conduit pipes pipes of any material on beams stilts, Length in meters, quantity, Diameter in eighths, Hook length, Diam. inch, No rod, Nomenclature of reinforcement, Specifications, Structural plan, Plan on, date:, scale:, Digitization:, calculation:, owner:, engineer:, External auditor:, Indicated, Cross-section detail of pipe, Photo view, D.g.p.t., October, Boyaca department, Sidewalk the ivory, Contract whose object is construction optimization of the aqueduct of the center the village ivory in the municipality of port boyaca, Municipality of puerto boyaca, Secretary of public works, Diego g. vine, Construction of pipeline passage of drinking water on the steps of the ravine the pigeons, draft, Contains:, Reinforcement detail, Ing. Jaider antonio castro sepúlveda, supervisor:, Ing. Jhon fredy soto, contractor:, Union temporal poblado ing. Henry alexander table fonseca, Pipe step, ground, River bed, Driving line, Steely, cables, Pendola, Quota, Quota, Rto, column, Esc:, Detail pendola, Esc, P.g, pipeline, corrugated, Gebe similar, protective, cut, Flat irons, Steel cable, Detail mount, Esc, Quota, P.g, Quota, See column detail, concrete, Shoes, Coatings, Columns, E.g., cement, Portland type, general specifications, Moderate energy dissipation capacity fy group use mpa meet ntc fy mpa meet ntc concrete f’c mpa meet nsr live load pa design can not be embedded conduit pipes pipes of any material on beams stilts, Length in meters, quantity, Diameter in eighths, Hook length, Diam. inch, No rod, Nomenclature of reinforcement, Specifications, Plan on, date:, scale:, Digitization:, calculation:, owner:, engineer:, External auditor:, Indicated, Cross-section detail of pipe, Photo view, D.g.p.t., October, Boyaca department, Sidewalk the ivory, Contract whose object is construction optimization of the aqueduct of the center the village ivory in the municipality of port boyaca, Borough

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features Deck / Patio, Car Parking Lot
Tags , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT