Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Cast-In-Place Concrete Pile DWG Detail for AutoCAD

Cast-in-place concrete pile – Details

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

ext., pile length, variable, Step cm., of the pile, ext., cm., drill holes, pile length, ext., niv sea ​​bottom, niv rocky mantle, rock, stratum, of sand, stratum, of sand, yam., niv, variable, torns., the pile, of having driven, rock, steel pipe, ced., pile, ced., pile, steel pipe, welded plate in field, cm., hollow pile, pile filled with concrete, spiral, steel pipe, pile, ced., pipe union detail, tube, ced., steel pipe, ced., pile, ced., tube, bezel, ced., pile, steel pipe, pile, sand filler, zone, length, total, section, concrete, pile stuffed, length, embedment, hole, pile, tube ced., ii iii iv, iii, pile hoisting, after, license plate, pile, to give project level, decapitate pilote, the metal piles should be protected against the fluctuation, of tides at least meters measured from its connection with the bed under, from the slab to the water as indicated below., cleaning with sandblasting in commercial finish mechanical cleaning., application of an epoxy, solid with, by manual means never after hours of, the mixture of the two without losing weight as indicated by the, in a single layer with minimum dry film thickness of mils, recommendable, If the application is done before the kneading of the latter, it should be, be done before your die hours the case may apply, Underwater., For driving the piles, you must take the necessary precautions to, meet the following requirements., the horizontal dislocation of the center of the head in any, respect the position indicated in the plans will not be greater than cm, the deviation in relation to the vertical fixed in the planes will be as, maximum of, concrete, steel, The tubular steel piles must be free of fractures to deface some deterioration. he, maximum ovation will be, of diameter of any section. the maximum arrow will not exceed, for long piles., It is required that the tip of the pile is made inside a bevel where the tip of the, the thickness of the bevel angle in relation to the horizontal, form an angle of, of the in order to allow the advance of this during the driving., according to the conditions that were established in the steel pile hara, the function of metallic ademe digging drilling inside them by the, use of rotating methods. for which the use of drill bits is required which is, considers that it is the most convenient, the maneuvers of placing the piles must be done on a boat, chalan with sufficient capacity to house the necessary equipment stability system, anchorage., It is necessary to use a scantillon that allows to position each pile to guarantee its, verticality as well as the position that must be kept above all by the use of the elements, prefabricated that require preset distances to ensure their assembly., it is convenient that during the positioning of the pile one restrains on the one hand any movement, lateral likewise it

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features
Tags , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT