Communication Antenna – Foundations Details DWG Detail for AutoCAD

Communication antenna – Foundations Details

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

npt, ntc, each, finished floor level, casting board, line center, top level of concrete, axis, diameter, the foundation will define the cfe depending on the antenna supply for this substation, stirrup, dice, isolated footing, league lock, isolated footing, dice, league lock, dice, var. do not., see detail, particular, dice, anchors, var. do not., staples with var., var., its T. perimeter, the stirrups the staples will be placed in the same plane one above the other., element, section, long. mts., pcs, cant. kg, dice, total:, dice, dice, shoe, lock, lock, league lock, placement of grout in cm layer. of thickness., dice, compacted fill, Specifications, particular, to pvms see, n.t.c, var. do not. cms., n.p.t., improved terrain see general specification for foundations no., anchors, reinforcing steel, amounts of work, concept, concrete template, excavation, concrete f’c, quantity, unity, filling, anchors, pza, sup bed, overlaps lt, do not., in., diam. nominal, rods, hooks, inf bed, hooks, hooks, overlaps, stirrups, hooks for, Table according to aci section should not overlap the total of the reinforcing rods in the same section., notes:, Chamfers of de in all exposed corners., Apparent use a maximum of uses., General specifications for foundations:, monofilament polyester reason, the material product of the excavation in the first cms. do not, of quality control. to guarantee the specified volumetric weight., as they come to work tension by adhesion., more than two hours between the two castings additives will be used to, specifications of the regulation aci according to table, free of any organic material., the casting of foundation must be done in two not exceeding, in the main arming of given columns, overlap is not allowed, the center center distances between each of the anchors, within your column you must have a tolerance, overlapping anchors will be done according to the, Petreous materials as well as water must be clean, the aggregate must be crushed. with a maximum size of, The minimum free coating on columns should be cm., The minimum free steel coating on the shoe must be cms., the reinforcing steel must be f and astm, use f’c t.m.a concrete with fiber additive, Thickness template with concrete, cylinders shows according to the specifications of the regulation, As part of the process, they must be obtained at least, this to fix the anchor anchor kit., very using for this purpose reinforcements of rod of, The fastening of the anchor with the reinforcement of the column must be, Acceptable tolerance is mm. in relation to any of, each anchor must be centered with respect to its, The finished level concrete crowns should be the same for, Each one of them must have a tolerance of mm., the anchors carry rope at the tip of cm. of length approx., that should be outside the level of the concrete., for the padding over the shoes, you should use good bench material, comp quality

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units
Footprint Area
Building Features
Tags , , , , , , , , ,