Construction Process Of Building Construction DWG Block for AutoCAD
CONSTRUCTIVE PROCESS CONSTRUCTION GALLERY : EXCAVATION PLACING CONCRETE FRAMES METAL RELEASED
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
niv, conagua, national water commission, comissa, ica, title of the plan :, rev, date, description, hid, est, ele, mec, general construction process, issue date :, key plan :, dimension :, electronic file :, date :, not rev :, not flat :, reference table, geo, revision table, first issue, for review., rev b, general coordination of projects, supply of drinking water and, sanitation of the valley of mexico, pluvial hydraulic infrastructure management, general subdirectorate, potable water, drainage and sanitation., executive project for the construction of the east emitting tunnel, in the federal district, state of mexico and the state of hidalgo., management of engineering, ing. hector f. fernández esparza, specialist in structures, m.i. juan reyes alvarado, mexican constructor of underground infrastructure s.a de c.v, technical supervision, revised, ing. Miguel Ángel Guzmán Escudero, Ing. arturo lopez strong, ing. alfredo rooms palaceta, ing. santiago flores leo, m.i. jesús julián avilés franco, resident of the project, ing. arturo aguilar solorio, approved, ing. Alberto Porras López, reviewed :, ing. faustino a. toxtli avilés, dirac s.a. de c.v., elaborated :, ing. juan paulín aguirre, adjustment to gallery geometry., gallery front excavation, putzmeister, valid ica, excavation section, assembly tunnel, first excavation eatapa, excavation and mounting tunnel supports, excavation with special can, excavation with hydraulic hammer, excavation with milling machine, lining, cast concrete, space of the, frames from axis to axis, boveda for water, upper part, filling of tezontle, to winch, bacha rezaga, siatema of withdrawal of lag, support foot, boveda, back, leg, foot, cast concrete lining, lag retraction process, vault placement process, back vault placement, robot launching process, casting process between frames, vault union and back with basket
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Industrial |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Other |
Measurement Units | Imperial |
Footprint Area | |
Building Features | |
Tags | autocad, bergbau, block, bohr, building, concrete, construction, constructive, drilling, DWG, excavation, frames, gallery, l'exploitation minière, le forage, metal, mineração, mining, perfuração, process |