ADVERTISEMENT

ADVERTISEMENT

P & ID for 30% HCL Generation and Scrubbing System

DETAIL P&ID TO PREPARE 30% HCL.
TESTED AND SUCCESSFULY WORKING SYSTEM.
GAS LOAD FROM REACTOR IS 1500 Kg/Hr.
4 STAGE SCRUBBING SYSTEM WITH MOC OF PPH+FRP SCRUBBER AND RE CIRCULATION TANKS.

FOLLOWING DETAILS ARE MENTIONED IN THIS DRAWING.
– RECIRCULATION TANKS CAPACITY
– SCRUBBER COLUMN SIZE WITH PACKED AREA AND PACKING MEDIA SIZE AND GAS INLET AND OUTLET DETAILS.
– HEAT EXCHANGER AND FALLING FILM ABSORBER CAPACITY.
– DM AND COOLING WATER SUPPLY DETAILS
– CENTRIFUGAL BLOWER DETAILS.
– ALL RECIRCULATION PUMP DETAILS.
– ALL INTER CONNECTING PIPING, ETP LINE, RECIRCULATION LINE, TRANSFER LINE, BALL VALVE, NRV, ROTAMETER, PRESSURE GAUGE, LEVEL INDICATOR SIZE AND DETAIL.
– ALL BATTERY LIMITS.
– HEADER DETAILS.

AUTOCAD 2004 FORMAT.
PDF DRAWING OF P&ID.
IMAGE FILE.
you can go through directly with this data.
for detail drawing of tanks and scrubber column you can contact us by leaving a comment below

Language English
Drawing Type Detail
Category
Additional Screenshots

File Type dwg, Image file
Materials Other
Measurement Units Metric
Footprint Area N/A
Building Features
Tags , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT