ADVERTISEMENT

ADVERTISEMENT

Rbc Meter Channel Coated DWG Detail for AutoCAD

Details – specifications – sizing – Construction cuts

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Datum elev, Pvc salt, Graduated stainless steel with anchors both ends, flow, flow, Pvc salt, Measuring well, Esc .:, section, axis, Esc .:, section, axis, Esc .:, section, axis, Esc .:, section, axis, Flow record well, Concrete floor, New, Stainless steel graduated ruler, With anchors both ends, Anchorages, Flow record well, Concrete floor, New, Esc .:, section, special Proyect, scale, Santa nepeña, district:, Santa, province:, Apartment, Ancash, review:, Rbc santa channel meter, Detail plane details, Special environment study chests, Installation of the service of hydrometry of the existing channels of the province of the region ancash, Regional ancash, C.c.b, Cad:, flat:, draft:, Indicated, scale:, Galecio bobadilla homes, designer:, Study management, reviewed:, date:, and. Camarena l., approved:, Level of study profile snip attachment, sheet:, New chimbote, district:, Location:, October, longitudinal section, Flat meter in plant, enamel paint, White color, enamel paint, Red color, Wrought edge, In high relief, Wrought edge, In high relief, Graduated ruler, scale, Scale detail, Pvc salt, Graduated stainless steel with anchors both ends, flow, flow, Pvc salt, Measuring well, Flow record well, Concrete floor, New, Stainless steel graduated ruler, With anchors both ends, Anchorages, Flow record well, Concrete floor, New, Esc .:, section, Esc .:, section, axis, Esc .:, section, axis, axis, Esc .:, section, Caudal in lt, There is water height in cm., where, Scale rule detail, Of structure, existing, Detail of gasket, dilatation, scale:, coating, Elastomeric, Polyurethane, Tecknopor, isolating material, Of polyolefin foam, existing, dilatation meeting, Channel stripper, Tub p.v.c., district:, province:, Apartment, review:, Rbc meter, Detail plane details, Cad:, flat:, draft:, scale:, designer:, reviewed:, date:, approved:, Level of study profile snip attachment, sheet:, district:, Location:, longitudinal section, Flat meter in plant, Reinforcement plate, Anchorages, Reinforcement details, Parshall meter geometric characteristics chart, Type meter, Rbc, Channel name, Take km, Lte, Lts, Meter discharge equation, Qmax, Qmin, Characteristics of the input channel output, Topography sheet, Nepenthe, For the execution of the meter must take into account the considerations of design considerations of installation of those indicated in the specification of the technical file. The type design of the meter must be rethought based on the existing topography. the ING. Resident prior to the execution of the meter must perform the basic surveying of the area of ​​influence in order to define the levels of the floor for its location adequacy of the design work that must be approved by supervision. In the execution of the meter it is included to carry out the cleaning of upstream channel sections downstream of the meter. The graduated ruler must be manufactured after verifying the accuracy of the structure according to design. The construction of the meter must be carried out with the maximum accuracy after which the calibration is carried out with the appropriate methodology. The calibration of the limnimetric sight will proceed from the table in case of any modification in the construction process will be recalibrated counting with the values ​​of indicated flows until completing the maximum cuadal required for the channel. Any modification to the design will be executed according to the conditions of previous agreement between the supervision the ing. Resident ing. designer., Notes, Techniques, Floor meter wall: simple concrete, Cement type portland, Cured minimum days, Graduate, Astm stainless steel material, The edges of the letter numbers will be engraved in low relief., Anchor at each side edge., Apply paint base epoxy enamel anticorrosive paint., Paint letters black numbers on white background., The construction of the meter must be executed with the maximum of pressure strictly respecting the dimensions indicated in the plane, The graduated ruler must be manufactured after verifying the accuracy of the structure according to design., The calibration of the graduated rule will proceed from the discharge equation. For its manufacture must take into account the calibration values ​​of caudale water levels., Any modifications to the design will be executed according to the field conditions. Prior agreement between the supervision ing. With approval of the design entity.

Raw text data extracted from CAD file:

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Datum elev, Pvc salt, Graduated stainless steel with anchors both ends, flow, flow, Pvc salt, Measuring well, Esc .:, section, axis, Esc .:, section, axis, Esc .:, section, axis, Esc .:, section, axis, Flow record well, Concrete floor, New, Stainless steel graduated ruler, With anchorages both ends, Anchorages, Flow record well, Concrete floor, New, Esc .:, section, special Proyect, scale, Santa nepeña, district:, Santa, province:, Apartment, Ancash, review:, Rbc santa channel meter, Detail plane details, Special environment study chests, Installation of the service of hydrometry of the existing channels of the province of the region ancash, Regional ancash, C.c.b, Cad:, flat:, draft:, Indicated, scale:, Galecio bobadilla homes, designer:, Study management, reviewed:, date:, and. Camarena l., approved:, Level of study profile snip attachment, sheet:, New chimbote, district:, Location:, October, longitudinal section, Flat meter in plant, enamel paint, White color, enamel paint, Red color, Wrought edge, In high relief, Wrought edge, In high relief, Graduated ruler, scale, Scale detail, Pvc salt, Graduated stainless steel with anchors both ends, flow, flow, Pvc salt, Measuring well, Flow record well, Concrete floor, New, Stainless steel graduated ruler, With anchorages both ends, Anchorages, Flow record well, Concrete floor, New, Esc .:, section, Esc .:, section, axis, Esc .:, section, axis, axis, Esc .:, section, Caudal in lt, There is water height in cm., where, Scale rule detail, Of structure, existing, Detail of gasket, dilatation, scale:, coating, Elastomeric, Polyurethane, Tecknopor, isolating material, Of polyolefin foam, existing, dilatation meeting, Channel stripper, Tub p.v.c., district:, province:, Apartment, review:, Rbc meter, Detail plane details, Cad:, flat:, draft:, scale:, designer:, reviewed:, date:, approved:, Level of study profile snip attachment, sheet:, district:, Location:, longitudinal section, Flat meter in plant, Reinforcement plate, Anchorages, Reinforcement details, Parshall meter geometric characteristics chart, Type meter, Rbc, Channel name, Take km, Lte, Lts, Meter discharge equation, Qmax, Qmin, Characteristics of the input channel output, Topography sheet, Nepenthe, For the execution of the meter must take into account the considerations of design considerations of installation of those indicated in the specification of the technical file. The type design of the meter must be rethought based on the existing topography. the ING. Resident prior to the execution of the meter must perform the basic surveying of the area of ​​influence in order to define the levels of the floor for its location adequacy of the design work that must be approved by supervision. In the execution of the meter it is included to carry out the cleaning of upstream channel sections downstream of the meter. The graduated ruler must be manufactured after verifying the accuracy of the structure according to design. The construction of the meter must be carried out with the maximum of precision and then the calibration is carried out with the appropriate methodology. The calibration of the limnimetric sight will proceed from the table in case of any modification in the construction process will be recalibrated counting with the values ​​of indicated flows until completing the maximum cuadal required for the channel. Any modification to the design will be executed according to the conditions of previous agreement between the supervision the ing. Resident ing. designer., Notes, Techniques, Floor meter wall: simple concrete, Cement type portland, Cured minimum days, Graduate, Astm stainless steel material, The edges of the letter numbers will be engraved in low relief., Anchor at each side edge., Apply paint base epoxy enamel anticorrosive paint., Paint the numbers black numbers on white background., The construction of the meter must be executed with the maximum of pressure strictly respecting the dimensions indicated in the drawing, The graduated ruler must be manufactured after verifying the accuracy of the structure according to design., The calibration of the graduated rule will proceed from the discharge equation. For its manufacture must take into account the calibration values ​​of caudale water levels., Any modifications to the design will be executed according to the field conditions. Previous agreement between the supervision ing. With approval of the design entity.

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT