ADVERTISEMENT

ADVERTISEMENT

Steel Railway Bridge DWG Detail for AutoCAD

Steel bridge details

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

of stringers, end detail, axis of bridge piece, upper contraventeo plant – stringers, in intermediate portals, galibo verification, plate, connection, symmetrical, the deputy director of operation, the manager of track and structures, communications and transport secretariat , general direction of tariffs, transportation, floor system, railroad of the isthmus of tehuantepec, engineering road of the center, sa of cv, railway and multimodal, superior contraventeo, inferior contraventeo, elevation, dimensions:, terawantepec clearance, project :, ivc, origin, of km., section, mm., calculation :, scale :, the general director, the manager of material resources ,, ing. baltazar fields of the source, projects and public works, ing. gustavo baca villanueva, communications, sct, and transports, secretariat, review:, indicated, num :, contract no., ing. gilberto zazueta reyes, ing. alejandro sandoval garcía, dimensions.- in millimeters, except where another unit is indicated., no effects due to shrinkage of the welding when it is cooled., waste, for which one will be given a pass with emery., special care in following the recommendations following:, materials.- all materials must be accepted by the self-service laboratories, so that follow-up to join the sections of the workshop will be the one that produces the mechanically guided meters, the cutting surface should be refined later. the or-, cuts of structural steel could be made by mechanical means or with so-, fabrications of the structural parts: the manufacture of the beams will be held, before painting it. all the structural steel will be given a coat of paint, workshop paint.- all the necessary welding should be placed on each member, before starting the assembly the plates of the supports will be put in place., supervision of the detailed procedure of the assembly of the superstructure for its assembly and field welding. – The contractor shall present the consideration of the easily identifiable casing adjacent to the welding, in such a way that they appear, code of the aws. before making the x-rays, the manufacturer must put mar-, x-rays of the welding.- will be made with films of low flammability and of, and with the position of the welding and the type and polarity of the current, having, make previously qualified welders According to the specified welding, warping or rims on the edges will not be allowed. All the welding will be done, all the bolted joints will be made at the foot of the work by trained personnel, residuals and prevent the plates from being deformed at the moment and after sun-, the construction of the superstructure and the manufacture of the pieces of steel will be adjusted to the specifications and the construction process indicated in this plan., specifications.- the construction norms of the sct in when not against-, come the indications of the plans. reference will be made in particular to the si-, resistance to rupture, which are inaccessible in the field, three hands of this paint will be received, zinc chromate paint and a coat of catalyzed epoxy paint, po and the damaged parts of the workshop paint will be given a hand of that, and scrape if necessary the structural steel. to all field welding, field painting. – After the structure has been assembled, it will be cleaned, nomenclature.- the designation of the structural profiles corresponds to that of the same paint. Once assembled, all the structural steel will be given a hand, zinc chromate. all surfaces that are not in contact in the workshop but, piece of extreme bridge, connection in pieces of, is, simultaneously, in the radiographs., study and approval or modification, as the case may be. , mind., next volumes and chapters:, curled and comply with the following standards:, field and workshop painting, profiles, plates and bars, electrodes for welding, aws and area., and immediate areas., elastic limit, structural members of the framework, dimensions, member, generalities, notes:, bridge over tehuantepec river, intermediate and extreme, portal, cortea – a, corteb – b, typical, support, profile, butt, welding, connection bridge piece , fill inside with plates, weld together in the field, ss, is, butt, support, welded to piece, cut – c, weld plate in field, fixed support, union plate, cort ef – f, reinforcement plates in knot i, knot i, connection knot i, reinforcement, bridge, bridge, rail, butt joint detail, reinforcement in webs outside, s, portal, stiffeners – bridge piece, soul – piece of extreme bridge, skids – part of extreme bridge, stiffeners – stringer, soul – bracket, upper skid – braid, lower skid – braid, pocket material

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Steel, Other
Measurement Units Imperial
Footprint Area
Building Features
Tags , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT