Tower Crane DWG Block for AutoCAD
Tower crane
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
stability, Take into account in, Tower cranes, To ensure its, By firm solid fixation to the floor., The cranes will be mounted properly, The cranes will not be loaded with weights, The maximum payload., maximum load, Tower cranes, Take into account in, Oblique shots, No oblique shots of the, Loads., Avoid detachments., Appropriate means shall be used to, Of the receipt will be reported to the health safety coordinator during the execution of the work., Engineers who must handle tower cranes in this area shall be informed in writing of the following, Omit or change the recommended safety aids., The tower cranes installed in this will be mounted following all the maneuvers that the manufacturer without, The cranes will comply with the regulations emanating from the technical instruction supplementary to the regulation of lifting devices, The installer of the crane will issue a certificate of commissioning of the same in which it is guaranteed its correct assembly, Forged on the structure of the crane., Shall be expressly prohibited in order to prevent the risk of falls by those working at the edges of, The gruists of this work will always wear a safety belt class that will tie to the solid point, Load displacement in the prevention of rollover risk., The tower cranes installed in this will be equipped with load limiting mechanisms of, Route will always remain signposted. The transit zone passages of vehicles shall be protected by a cover, The power cords of the tower crane will be made by burying a minimum of cm. of the, Under the same upper winds, The works with the tower crane will be paralyzed in this one by criteria of when the works must be realized, Prior to the electrical supply of the crane in the general picture of the work., The disconnectors of the electrical control of the machine the power this maneuver involves the disconnection, Lift the free hook of loads to the mast., At the end of any work period, the following maneuvers will be carried out on the tower crane:, In the presence of the work with the crane will be paralyzed leaving out of service in vane until passed, Air suspension of persons by means of the hook of the, The tower cranes used in this will be equipped with standard steel hooks fitted with safety catch., The health safety coordinator during the execution of the work., Load-bearing cables having a, Long from the counterweights the tip., The tower cranes to use in this will be provided with cable tie to anchor the seat belts everything, Security along the inner staircase of the tower., The tower cranes used in this will be provided with cable lock to anchor the belts of, The tower cranes used with this will be equipped with the climbing ladder the protected with rings of, The tower cranes mounted on it shall be provided with a sign in place where the load is clearly set, The tracks of the cranes installed in this will meet the safety conditions cited in the safety study, The cranes will be located in the place indicated in the plans that complete the health safety study., Basic safety standards collective protections, Ballast, Chassis side crossbeams, Ramp for the finals, Track stop, Of travel translation, Anchor feet, concrete block, Mast first, Masts tower sections, Cable winder, Power supply, lifting mechanism, Base ballast, Anchor feet, concrete block, Telescoping box, tower, telescopic, hook, functioning., Located according to the plans., Base of planks flush in the pavement., Set the knobs to zero., Leave pen in position, The risk of electric aggression., Arrow foot, axis of rotation, Rotating pivot, Fixed pivot, Tie rod, Arrow holder, Arrow car, Tower crane with upper swivel, arrow, Arrow carriage mechanism, Arrow elements, Arrow strap, arrowhead, Safety to reduce the risk of falls., Maximum permissible tip., Health., Of threads will be replaced by giving account of, During the execution of work., The following regulations will be notified to the Health Safety Coordinator, The engineers who must handle tower cranes in this will be informed in writing of the, Than the manufacturer without omitting or changing the recommended auxiliary safety means., The tower cranes installed in this will be mounted following all maneuvers, Of lifting devices, The cranes will comply with the regulations emanating from the complementary technical instruction of the regulation, Ensure proper assembly operation., The installer of the crane will issue a certificate of commissioning of the same in which
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Heavy Equipment & Construction Sites |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, bagger, block, bulldozer, chariots, crane, DWG, élévateurs, empilhadeira, escavadeira, forklift, gabelstapler, grues, guindaste, kran, tower, tracteurs, tractor, traktoren, trator |