4 Bay Culverts, 3x2m, Bi-Oceanic Corridor, Bolivia DWG Block for AutoCAD
Sewer along the Bi-oceanic corridor No. 4, Bolivia
Drawing labels, details, and other text information extracted from the CAD file (Translated from Galician):
Longitudinal sewer profile, Front view of the head, Side lift of the head, section, View on the plant of the head, Esc., Odebrecht, Alcantarilla prog dtc, Lamina, Ppsalc, Project .: paving construction of the section carmen stream built construction optimization of the end of engineering, Accidental association, Geometry location, Contractor:, Contractor:, Administrator, Bolivian of, Roads, Abc, Bolivian road administrator, Vice minister of communications, Republic of Bolivia, Ministry of works, housing services, Civil aeronautics, Monitoring control:, Name, Date, Description, Odebrecht iasa, Preparation of adequacy, Approval of as built, Preparation of as built, Approval of adequacy, Ecoplan cgl, Odebrecht iasa, Indicated, Scale:, Sewer drawer, Drawer armor, Odebrecht, Alcantarilla prog dtc, Lamina, Ppsalc, Project .: paving construction of the section carmen stream built construction optimization of the end of engineering, Accidental association, Drawer armor, Contractor:, Contractor:, Administrator, Bolivian of, Roads, Abc, Bolivian road administrator, Vice minister of communications, Republic of Bolivia, Ministry of works, housing services, Civil aeronautics, Monitoring control:, Name, Date, Description, Odebrecht iasa, Preparation of adequacy, Approval of as built, Preparation of as built, Approval of adequacy, Ecoplan cgl, Odebrecht iasa, Scale:, As built, Use epps, Keep the workplace clean organized., Obey the signage Security is, Flex beam, Barbecues, Sand filter, Thick continuous, Geotextile rug, Open joint, Record, Mix of, Barbecues, Sand filter, Thick continuous, Gravel, Pvc tube, Level of solera, Structure of, Concrete type, Concrete thickness type, Leveling layer of de, Level of slope, Filling height, Compacted fill, Kgf, Total weight, Filling height cm, Quantity, Pos. No, Diameter, Unit weight, Total length, Separation, Diameter, Length, Total length, Sheet of steels, Linear meter of, Steel weight, Internal face, Position: external face, Legend:, Face, External, Top face, Position: lower face, Legend:, Diameter, Position, Lengths, Quantity, Unitary, Total, Unit weight, Total length, Diameter, Total weight, Total weight, Steel board, Steel weight, Dtc, Length, Pending, Solera quota, Level slope, Download:, Pillar, Esc., section, Esc., section, Esc., section, Esc., Plaster armor, Beam, Walls, Beam, Ground that is below the bottom slab for compacted filling., Capacity to withstand the admissible pressures indicated in the will be replaced, In case the ground below the foundation of the slab does not have the, Notes:, Admissible pressure of the ground in the foundation., Structural coating in contact with earth water:, Structural concrete type with cylindrical resistance is characteristic of days, Structural steel type with flow limit characteristic of, Dimensions of the structure in centimeters., Regulation type concrete with cylindrical resistance is a feature of the days, Concrete with fine finishing, To the outline of the head, Outline of the head, Slope protection with pickle, Flex beam, Barbecues, Sand filter, Thick continuous, Geotextile rug, Open joint, Record, Mix of, Barbecues, Sand filter, Thick continuous, Gravel, Pvc tube, Manual compaction was made of the outer edge of the entire construction, With compaction control, Odebrecht, Alcantarilla prog dtc, Lamina, Ppsalc, Project .: paving construction of the stretch carmen creek built adequacy optimization of the engineering end, Accidental association, Head armor, Contractor:, Contractor:, Administrator, Bolivian of, Roads, Abc, Bolivian road administrator, Vice minister of communications, Republic of Bolivia, Ministry of works, housing services, Civil aeronautics, Monitoring control:, Name, Date, Description, Odebrecht iasa, Preparation of adequacy, Approval of as built, Preparation of as built, Approval of adequacy, Ecoplan cgl, Odebrecht iasa, Scale:
Raw text data extracted from CAD file:
Language | N/A |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, bay, block, bolivia, corridor, DWG, kläranlage, sewer, treatment plant, xm |