Bridge Construction Process DWG Detail for AutoCAD
It PRESENTS A PLANE OF CONSTRUCTION PROCESS OF A BRIDGE ON A CLEAR CHANNEL; DESCRIBED IN DETAIL THE STEPS IN THE CONSTRUCTION PROCESS BOTH superstructure SUBSTRUCTURE CAST PILES BASED ON THE SITE.
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
elevations in meters, longitudinal, porejedeproyecto, fixed supports, mobile supports, access slab, crown, corbel, bracket, dentellón, profile of the natural terrain by lateral axis, boundary, ajasto type IV axes, false eave, slope, footboard Existing masonry, existing garrison, covered spill cone, general plant, location sketch, no. project:, section: construction plan, description, rev., I make, date, bridge, notes :, important recommendations, recommended measures to avoid plastic cracking, construction recommendations, recommended measures for, avoid cracking by, general procedure for the construction of piles, general notes :, – locate the project axes according to the project stations and mark them in the natural terrain. – place the necessary work signals according to the progress of the work. – the diversion of the waters of the canal will be maintained, – the perforations will be made for the piles of the trestles along their entire length., – following the recommendations of the construction of piles, the assembly of these elements will be placed in the perforations made. – Perform the casting of the piles by the tremie method. According to the geotechnical study, during the exploration the groundwater level is not detected, however, there may be saturation of the surface materials due to the nature of the channel. the construction company must take the corresponding measures in case of presenting water table at the time of construction of the piles., – after casting the piles, will begin with the assembly of the crown, diaphragm, benches and stops on the trestles. – strain the crown and benches on the easels. – start of the construction of embankments and spill cones., review the notes of general construction procedure for piles., – once the resistance of the concrete project in the last elements, casting of the heads, has been reached, it will proceed to place the support benches, neoprene supports and subsequently the beams will be placed., proposal of constructive process, access slab., note: the number of cranes to be used and their capacity will be the responsibility of the construction company., – during the execution of all the works in case of being necessary will have to realize the cleaning of the work, leaving the area of work in optimum conditions of hygiene and hygiene. – At the end of the execution of the work, it must be cleaned, leaving the elements of the bridge, circulations, storage places, etc. in optimal conditions of hygiene, safety and final appearance of the work., of parapets, auction and, placement of the boards., by plastic settlement
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Detail |
Category | Roads, Bridges and Dams |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Masonry, Plastic, Other |
Measurement Units | Imperial |
Footprint Area | |
Building Features | |
Tags | autocad, bridge, channel, clear, construction, DETAIL, DWG, plane, presents, process, steps |