Details Details Siv DWG Detail for AutoCAD
Details Installing a System Intercom and Paging Type for Industrial Facilities Industrial .
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Integral consultancy in, Engineering s.a. Of c.v., With her, Inner pond, paradise, Project area, Num., date, C.p., localization map, unscaled, Symbology, Video camera system explosion-proof, Underground channeling, Rack air channeling, System control keypad, Digital video recorder, Video monitor, Mtxv, Video matrix, Dvr, Concrete, Diameter of the tubing tray, Cedula of the pipeline, Pipe material, Ag: steel: aluminum, Alcp: aluminum with pvc cover, Scctv: closed circuit system, of TV, Indicates identification number, Indicates channeling of scctv, Ch: cable tray, T: pipe, Cable holders, The cable tray, Connection log box outdoor use, consecutive number, General notes, All the aerial conduit pipe as well as all such as: boxes etc. Will be copper free aluminum ced. With pvc coating inside its urethane. The underground pipelines will be of galvanized steel conduit conduit ced. Of diameter would be used small sealant compound in both ends the entrance entrance of to avoid penetration of rodents. The chambers will be composed of a single unit integrating the movement mechanism lens housing fulfilling the area calse div. To see installed equipment in control room new view flat arrangement of cctv system cabinet. To see record detail view map communication routes between cc new cto. Electrical plant link. See plane of buried electric pipes of the civil area, General notes, The graphic representation of the distribution of accessory devices indicated here is schematic therefore the precise location of the same for their installation installation should be adjusted in field according to their actual size. All the aerial conduit pipe as well as all such as: boxes etc. Will be copper free aluminum ced. With pvc coating inside its urethane. The underground pipelines will be of galvanized steel conduit conduit ced. Of diameter would be used small sealant compound in both ends the entrance entrance of to avoid penetration of rodents. The chambers will be composed of a single unit integrating the movement mechanism lens housing complying with the area class div. The equipment of the intercommunication system voceo to be installed in external area comply with the area classified class division the laying of the cables from the origin to its destination must be of a single shot not allowing splices or intermediate connections with other accessory devices. The penetrations that are made in the walls of floors must be sealed by composite once the necessary elements of the voice intercommunication system voceo of the cctv have been installed for its operation. Any excess cable must be wrapped perfectly to fit without exceeding the minimum radius of curvature., Reinforced surface for mounting, signaling, signaling, Area for telephone assembly, Wall mounting screws, Reinforced surface for mounting, Coal for Concrete Rack Mounting, Angle of carbon steel, Exciter test, Speaker with steel angle bracket, speaker, directional, Stainless steel washers, Stainless steel screw, For screw, Long, Angle of carbon steel, Of explosion, With pvc coating, Multi-use station outdoor use, Mm, Clamp type, With pvc coating, Cable type armed, Mm, Explosion test, Connector for, Protective cover, Multi line station, Concrete column, With integrated driver, Outdoor loudspeaker, Mm, Clamp type, Angle of carbon steel, Column of, Wall mounting detail, concrete, Pvc coated aluminum tube, Acoustic booth, Multiline station, speaker, Rack, concrete, Installation detail, Generator, Various tones, Balancer, Line, box of, Connection, Conduit pipe, Installation detail, In control room, In concrete rack, Acoustic booth, Voiced intercom station, Exp. Anchor, With wedge design, Stainless steel screw, Npt., Mm., Esc:, Acc., Mm., Pvc coated aluminum tube, Fiberglass acoustic cabin supported on steel angle, Connector for cable type explosion proof mm, Esc:, Acot:, Esc:, Acc., Mm., Esc:, Acot:, Esc:, Acc., Mm., Esc:, Acc., Mm., Esc:, Acc., Mm., Esc:, Acot:, General notes, The pipes in the external area will be of pipe, Copper free aluminum conduit ced. with, Pvc outer coating inside urethane, Piping within the control room as well as the, Underground pipelines will be piped conduit ced., Made of galvanized steel., The equipment of the intercom system voceo, Be installed in an external area cu
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Detail |
Category | Mechanical, Electrical & Plumbing (MEP) |
Additional Screenshots | |
File Type | dwg |
Materials | Aluminum, Concrete, Glass, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, DETAIL, details, DWG, einrichtungen, facilities, gas, gesundheit, industrial, installing, intercom, l'approvisionnement en eau, la sant, le gaz, machine room, maquinas, maschinenrauminstallations, provision, sound, system, type, wasser bestimmung, water |