Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Fish Processing Plant – – Expansion Plans DWG Plan for AutoCAD

Architecture – Plumbing and Electrical Structures

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

exit, of earthquakes, in cases, safe area, ceiling, electrical, sub station, general plant first floor, income, ss.hh, proy. flow of ceiling, circulation, sinks, processing room, surimi, warehouse, packaging, pressing, salt storage, camera, storage, dormit., room, plastic curtain, waste chute, well, sidewalk, cistern, machine, management , file, meeting room, offices, second floor – office area, rest, maintenance, area, cauldron, chiller, tanq. lime, septic, domestic, industrial, bunker, men, women, precooked, sshh, disinfection room, balcony, motor, showers, kitchen, dining room, cement floor, flooring, parquet floor, sh, footbath, maniluvio, sentry, dryers, packaging, boarding hall, waste, area, machinery, slab, concrete, drying, ceramic floor, garden, water tk, provisional, room extension, fence construction extension, synthetic matte oil, washable latex, tarrajeo waterproof, sanitary, paintings, carpin teria, ceiling, stairs, anticorrosive and epoxy base, satin latx, varnish and lacquer, lavatory white slab, toilet one piece, metal with wood, metal snail, observations, coverage, sky, floors, satin , walls, beams, finishes, baseboards and contraz., doors, carpentry, sale., wood glass, polyurethane panels, polished and burnished cement, flagstone, tarrajeo rubbed, wood, reception of mat. premium, boarding and extension of aisle d emb., environments, raw glass with wooden frame, wood cover with slate tile, raw glass with metal frame, plaster with impearmibilizante, enlargement of machine room, expansion of storage chamber, box finishes, satin acrylic latex, walls, technopor aluminum profiles, cob. from vigueria met. with asb cement, enlargement, enlargement, shipping, raw material, reception of, translucent calamine cover, aisle, cut a – a, cut b – b, mat. premium, reception, facade, height, oserv., code, box of bays, width, cut c – c, area of ​​extension of work, extension of work, indicated, cad dib:, investments holding sac, processing plant of hydrobiological products, inhope sac, owner:, scale:, date:, sheet:, plane:, foundation, location:, electric extension plan, storage chamber, loading and receiving area of ​​raw material, variable, anchor columns in, foundation, overburden, screed, foundation, insulating membrane, technopor, screed, screed, simple concrete, reinforced, polyethylene panel, reception of raw material, foundation detail, ceiling structure plant, metal joist, brace, metal joist, excessive scouring, insufficient measure, concave, a.-desirable profiles, b.-acceptable profiles, truss, det – a, det – b, det – c, tensioner, worm device, lower flange, c.-not acceptable profiles, insufficient throat, convex or, excessive convexity, overlap, metal joist, see det., movable support, ridge, cut a – a, det. metal joist, electrowelded to tijeral, tijeral, detail – b, note, epoxy enamel., x – x cut, execution and quality controls for, metal structures, the materials to be filled will be:, -planchas of coverage, manufacture in workshop, to the effect of maximum use of materials. will be accepted until, in bars with lengths of up to six meters, splices will not be accepted., in the edge joists, splices will be used every three meters in length, placing the joints in the union with the false beams., the holes for bolts they will be made with drills and they will not be cut, with a blowtorch or punches., the cartels and plates in general will be cut with a guillotine or a saw, it will not be allowed to cut with a torch. The last hand will be applied once the assembly of the structure., this painting process will be applied even in the surfaces that will be in contact, with plates of union., welds, the method of manual electric welding with fused electrode coated, will be used, in all the joist encounters, tijerales, cartels, plates and profiles in general., for the visual inspection of the welding cords will be adopted the following criteria:., existing metal roof, general floor, det. of iron in mobile support, electrowelded to tijeral, det. of iron in fixed support, column, det. of plate anchored to column, welded to plate, det. of iron in meeting of, det. of mobile support, nut, lock nut, basic triangle, construction, column table, shoe, typical detail, auction columns, admissible pressure of the land, national regulations of buildings, regulations used for the design, general technical specifications, overloads , coatings, brick, mortar, -cement: portland type ms, columns, transversal reinforcement, machine room expansion, typical detail of foundation, construction

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Plan
Category
Additional Screenshots


File Type dwg
Materials Aluminum, Concrete, Glass, Plastic, Wood, Other
Measurement Units Imperial
Footprint Area
Building Features Garden / Park, Deck / Patio
Tags , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT