Hydraulic Diversion Tunnel Longitudinal Section for Suoi Chan 2

ADVERTISEMENT

ADVERTISEMENT

or

Comprehensive longitudinal section of a hydroelectric diversion tunnel for the Suoi Chan 2 Hydropower Project, depicting tunnel alignment, rock classification, and lining details spanning 1587.515m. The tunnel features multiple cross-sections (Types A, AB1, AB2, B, C, and D) corresponding to surrounding rock classifications (II-V), with specifications for concrete lining (M200/C20), shotcrete applications (10cm thickness), and reinforcement systems. Key elements include:

Tunnel Parameters

– Total length: 1587.515m with chainage markers throughout
– Tunnel profile: 9.0m² cross-sectional area
– Gradient variations: 0.22% to 3.0%
– Direction changes: N15°11’1″E, N35°0’8″E

Rock Classification & Support

Type II rock: Section A/AB1 lining with shotcrete and rock bolts
Type III rock: Section B/AB2 lining with reinforced concrete
Type IV/V rock: Sections C/D with heavier reinforcement

Includes a surge tank connection, vehicle turning areas, and specifications for grouting, hardcore beds, and waterproofing. Working water levels range from minimum 117.80m to maximum 139.00m, with dam elevation details and pressure pipe connection specifications.

Language Arabic
Drawing Type Section
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units Metric
Footprint Area 1000 - 2499 m² (10763.9 - 26899.0 ft²)
Building Features
Tags , , , , , ,
or
ADVERTISEMENT

Release Information

Share Your Valuable Opinions

Cart (0)

  • Your cart is empty.