Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Multifamily Apartment DWG Full Project for AutoCAD

Full project of a multifamily apartment. Plants – Sections – Views

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

ss.hh.d, hall, hall-catwalk, roof, room, studio, sh, kitchen, living, dining room, patio, bedroom, shd, shv, bar, room of uses, multiple, metal, type, alfeizer, material, window box, width, height, door frame, wood, laminated glass, semi basement, first floor, second floor, front elevation, lateral elevation, bedroom, cut to – a ‘, pendular, bronze color, cut with break, sum, cut b – b ‘, detail of, minimum, length of, of beams, development, in ends, confined core, interior of, bend in, column, beam, clay brick, empty stair, empty, beam, double joist, solid slab on, roof ladder, eccentric column, npt, insulated shoe, indicated, shoe detail, cant., shoe frame, reinforcement, section a-a ‘, nfp, section b-b’, column table, section:, foundations, hsc, flooring, ax, detail of stairs, corridor, semi – basement, installation. sanitary, symbol, description, irrigation tap, union siamesa, water point, check check valve, water p feeder network, water legend, drinking water network, gate valve, tee, water meter, to the public network, from the public network, a gutter, threaded bronze register, sewage collection box, sewage pipe, sewage, sump with trap p, ventilation pipe, perfect, the accessories of sanitary devices must be, between two universal joints and in niches, exposed, they can be installed with a universal union, of such quality, that they guarantee an operation, properly constructed., especif. techniques – water, will be made of bronze and installed at the finished floor level, they can be masonry or prefabricated concrete, specific. techniques – drainage, atmospheric in each sanitary device and protect, corresponding water seal., to drain bell spigot, in both cases with tarrajeo polished., drain legend, pluvial drain pipe, sewer riser diagram, collector, public, amount of ventilation, uprights, uprights pluvial, ditch, goes to patio-garden, street, diagram of water stiles, meter, water, goes to the ee.ee, diveros tgs., arrives from electro center, sa, b, sc, d, se , f, sf, g, sg, h, arrives and directs ee.ee to the, legend, switches simple ticino, board or subtablero in metal cabinet of fo.go-., with door and sheet type of flush – unless indicated – height of, well to ground dimensions indicated in drawings., switches switches – ticino, water heater model alfano, thermal key, double switches ticino, sa, b, c, switches triple ticino, scom., exit light center – ceiling , sa, b, c, unless indicated., Recessed conduit for conductors of telephone by floor or wall pvc-sap diameter specified, in planes., circuit timbre, circuit line to earth, meter meter watts hour in metal cabinet of fo.go -., with door and sheet type of embed – except indication – height of, copper bar, detail of earth well, salt, sifted earth, carbon plant, earthed, single-line diagram, std, ee.ee meter, single-phase, maximum demand, demand factor, installed power, area, use, sum, level, special loads, passages, total installed power, load table, distribution board in metal cabinet of fo.go-., with door and sheet type of flush – except indication – height of, diagram of electric stile, tendal, arrives and low line of telephony, low line of telephony, arrives telephony line, arrives timbre circuit, equivalences, conductor, tube, specifications, insulation of thermoplastic material resistant to humidity and retardant to the energy, the conductors of energy will have a different color in each phase, national electricity, walls and within ceilings, between boards and outlet outlet, semi-basement, central column, cross sections, secc c-c ‘, secc d-d’, secc e-e ‘, window, lightweight slab, secc f-f’, length, folded stirrups, bending, columns, beams, upper, and lower, slabs, technical specifications, concrete, isolated footings, running shoes, retaining walls, beams, lightweight slabs, solid slabs, ladder, false shoe, shoe flooring, coatings, shoe cast on floor, shoe emptied on earth, retaining wall in contact with the ground, steel, running foundation, overburden, retaining wall protected by lining, banked beams, flat beams, lightened, solid slabs, overloads, will be made with clay bricks from the area, masonry, – constructive process: the masonry walls will be built according to the details indicated in the corresponding sheets, – they are built after emptying the beams and columns, cyclopean, ramp projection, from ee. ee., to earth, cir. elect., garden, garden, branch

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Concrete, Glass, Masonry, Plastic, Steel, Wood, Other
Measurement Units Imperial
Footprint Area
Building Features Garden / Park, Deck / Patio
Tags , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Startland Construction

Leave a Reply

ADVERTISEMENT