Plant Treatment Of Waters DWG Block for AutoCAD
Plant treatment of waters .
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
version, From villamanta, Implementation project of the e.d.a.r., Designation of the plan:, Title of the project:, doc., Work number, Sheet of, Of plan:, Scales:, replaced by:, Replaces:, Verified, approval, Reason for the modification, date, Delineated, Useful height, pile, Fences, Cutting edges, Fences, General body armor, Madrid’s community, Public local administration, Role counseling, Isabel II, channel of, Of the madrid community, Of the municipalities, Sanitation debugging plan, Of the municipalities of the community of madrid, Sanitation plan, Ix performance river basin perales, E.d.a. Of brook apiary, Plan number, Sheet of, Madrid’s community, Authors of the project:, D. Antonio, Title of the map:, Of the municipalities of the community of madrid, Sanitation plan, River action, Implementation project of the e.d.a.r., from…………………………………………. (I.e., Date: September, scale:, Authors of the project:, business, Collegiate number, D. Nemesis, business, Collegiate number, Technical compliance:, Fdo. Department head, Infrastructure development, D. Jose antonio sanchez fernandez, Longitudinal profile……………., Isabel ii channel, Counseling, Public administration local function, Longitudinal profile……………., Sheet of, Authors of the project:, version, From navalagamella, Implementation project of the e.d.a.r., Designation of the plan:, Title of the project:, doc., Work number, Sheet of, Of plan:, Scales:, replaced by:, Replaces:, Verified, approval, Reason for the modification, date, Delineated, version, From navalagamella, Implementation project of the e.d.a.r., Designation of the plan:, Title of the project:, doc., Work number, Sheet of, Of plan:, Scales:, replaced by:, Replaces:, Verified, approval, Reason for the modification, date, Delineated, Rolling, Rolling, section, section, Dn water inlet, Dn sludge outlet, Conventional section elevation, scale, Rolling radius, Polyethylene pipes, Board exterior, Piles, Hexagonal shape, From the edge, section, Equidistant saddles, Max., Fixed load, Dan, Horizontal, Quota of, This way a completely smooth surface of the hearth, Normal steel control, The coating of the main reinforcements, Concrete control with test pieces on site, note:, Will be in cm., Control of normal execution, Characteristics of materials, Control levels, Steel in armor, Concrete type, Lower floor, plant, scale, Upper sill, Fences on stilts, The subsequent filling of these holes will be by, Replace the bushing sleeves with the holes, According to the table saved, civil work., Exceptions., Be left inside, A wire of mm. nylon., Polyethylene pipes, Step of, Ground level, Do not fill with concrete with the bottom scraper mounted, rule, Fences of each, Conventional section elevation, decade, Fences, Ground level, scale, Fences, Ground level, Normal steel control, Will be in cm., Control of normal execution, Concrete control with test pieces on site, The coating of the main reinforcements, note:, Steel in armor, Concrete type, Characteristics of materials, Control levels, section, Rolling radius, Minimum radius, Mm., Brand pasamuro, After the concrete is spaced between, Channels must be filled up, After the concrete is spaced between, Channels must be filled up, Wooden scraper, In place of rubber sheets, Leave a slope of, Towards the exit casing., Rolling load, Dan, Water collection channel., Concrete, Leveling, Concrete, Leveling, Is rotated in order to level, The annular channels by means of wooden scrapers, Is rotated in order to level, The annular channels by means of wooden scrapers, Cm. Below the level of, Distanced from each other by m. approximately, After the assembly of the bridge of scrapers will have available, Small annular channels of cm. Wide, Cm. Below the level of, Distanced from each other by m. approximately, After the assembly of the bridge of scrapers will have available, Small annular channels of cm. Wide, decade, Completion mode of the bottom floor, The floor of the work will be made of crude concrete, Completion mode of the bottom floor, The floor of the work will be made of crude concrete, section, electric canalizations, For situation see plan, Polyethylene pipes, Avoiding interference with the, Dn flanges, plant, scale, Decanter bridge, Adjust the rails, Brand bushings, Brand pasamuro, High point, In the channel, Output d
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel, Wood, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, block, DWG, kläranlage, plant, treatment, treatment plant, waters |