ADVERTISEMENT

ADVERTISEMENT

Pneumatic Solenoid Actuator Valve DWG Block for AutoCAD

typical assembly diagram 5v/2p pneumatic solenoid pneumatic actuator valve coupled morin vanessa valve

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

phases, amperage, voltage, threads, ., reference, client:, designed by:, drew by:, reviewed by:, approved by:, registration number, departure, equipment:, made by:, date:, schneider centroamerica s.a., register, reference, client:, equipment:, size, electric service, schneider centroamerica s.a., review, date, departure, drawing, design, approved, date, Juan Brook, register, reference, client:, equipment:, size, electric service, g.d. electric engineering, review, date, departure, drawing, project manager, approved, date, Juan Brook, register, reference, client:, equipment:, size, electric service, typical connection diagram, review, date, departure, elaborated, project manager, approved, date, Juan Brook, compression station paredon, Typical bot installation. field, of the mod., bot. field, material’s list, item., description, union nut rec. int. urethane, Rec. stamp int. urethane, cople rec. pvc with urethane interior, your B. conduit de rec. pvc int. urethane, gulet box guit rec. int. urethane, cople flex. rec. pvc for hazardous areas, clamps type rec. pvc., cant, p., your B. conduit de rec. pvc int. urethane, section, refinement, rev., not plan:, esc:, approved:, revised:, drawing:, place: compression station jose colomo, in the contract:, acot in without quota., ing. lenin antonio reyes lira, unscaled, plan elaborated in villahermosa tab., oct. of the, pemex production exploration staff, ing. lucio manuel zabala leon, work supervisor, ing. roger castle nava, c.p., date, Mca., vo bo, by, date, num., reference, for approval comments, nov, ing. magdiel fernandez castro, ing. jesus a. zamudio of peace, manager of the compressor jose colomo, production exploration, nov, j.a.z., typical diagram of the installation of the electrical work towards the arrival of the valves with actuator of the emergency stop of the turbochargers of the production assets muspac of the southern region., material’s list, item., description, nipple of diameter of long. rec. int. urethane, female seal rec. int. urethane, rec. int. urethane, cant, p., cople flex. rec. pvc for hazardous areas, p., rec. int. urethane, p., union nut rec. int. urethane, bushing rec reduction int. urethane, union nut rec. int. urethane, cople flex. rec. pvc for hazardous areas, section, support for fixing fixtures on equipment arrivals, p., conduit of rec. int. urethane, Typical installation of pneumatic fitting, gauge, versa, morin, instrument air inlet, Typical installation of the sun valves., open, morin, acutrak box, rev., not plan:, esc:, approved:, revised:, drawing:, place: compression station jose colomo, in the contract:, acot in without quota., ing. lenin antonio reyes lira, unscaled, plan elaborated in villahermosa tab., oct. of the, pemex production exploration staff, work supervisor, ing. roger castle nava, c.p., date, Mca., vo bo, by, date, num., reference, for approval comments, production exploration, nov, ing. Jesus

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT