Railway Signaling Cover Page for Xining Station CTC Monitoring System
Technical Drawing Overview
This drawing serves as the cover page for a comprehensive railway signaling system documentation set for Xining Station. The drawing presents the completed project documentation for the CTC (Centralized Traffic Control) and computer monitoring systems implemented at Xining Station as part of a broader station renovation project.
Project Specifications:
– Document reference: Xining Station Reform-J-04-01~31
– Volume: First of one volume (complete set)
– Production date: December 2014
– Implementing organization: China Railway Signal & Communication Tianjin Branch
The cover page indicates this is a completion drawing set (竣工图) which represents the final as-built documentation for the railway signaling infrastructure. This technical documentation is critical for operations, maintenance, and future modifications to the Xining Station control systems.
The drawing follows standardized railway documentation practices with proper titling, volume indexing, and organizational identification – essential elements for railway signal engineering documentation management within the Chinese railway system.
Language | Chinese |
Drawing Type | Graphics (Pattern/Texture/Material) |
Category | Transportation & Parking |
Additional Screenshots | |
File Type | dwg |
Materials | |
Measurement Units | Metric |
Footprint Area | N/A |
Building Features | |
Tags | Completion Documentation, CTC System, Railway Control Systems, Railway Modernization, Railway Signaling, Signal Engineering, Xining Station |