ADVERTISEMENT

ADVERTISEMENT

Reinforced Concrete Slab – Details DWG Detail for AutoCAD

Reinforced concrete slab – Details

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

enclosure, lock, enclosure, lock, enclosure, reinforced floor slab of mezzanine cm., Longitudinal reinforcing of slab, indicates wall projection two mid-axis, indicates placing two canes between each pair of rods, the rod will be of the high bed in the area of ​​the rod will be the low bed in the rest of the entreeje, do not., do not., l. high no, l. low no., Transverse reinforced slab, post, slab, enclosure, lock, top of mezzanine, cut, Concrete filling in monolithic work with the slab, additional connector no. omit in ruffles, lock metal codif., variable, variable of, Wall, armed projection of castle, mezzanine slab, cd e., lidgotero, dropper, chamfer, top of mezzanine, enclosure, lock, armed projection of castle, cut, lock, dropper, lidgotero, chamfer, cut, enclosure, top of mezzanine, armed projection of castle, barandal, chain under walls in, do not., the guns indicated with rod can be changed rod according to table, separation with, longitude of square overlaps except where another measure is indicated., dimensions in centimeter welds in millimeters, the saddles will receive the secondary transversal reinforcement., no more than two contiguous overlaps should be left in alternating with the adjacent rods., In the same cross section, no more than one third of the reinforcement should overlap., the bending of the rod will preferably be done in a bench to obtain the indicated lower upper coatings., All the bends of the rod will be made around a bolt whose diameter will be times that of the rod., steel reinforcement with a resistance of, The specified coatings must be verified before casting., The maximum size of the coarse aggregate will be cm, If there is a premixing plant in the place, it will be advisable to use it if there is not a laboratory in order to indicate the adequate proportion according to the existing aggregates in the place., free coatings on slabs in chains cm., concrete with a resistance the compression with a, the support of props should be made on suitable trawls perfectly supported on the ground., the greasing must be done before placing the assembly., The formwork should be completely leveled with counter-shaft if it is lead as required., To achieve a good connection of box tubes it is necessary to make the tubes a fold as much as the rods allow., the placement of the reinforcement must be done foreseeing that no rod coincides with any box, in case of coincidence there will be deviations to the reinforcement in the form of a horizontal swing with a minimum separation of cm at the center of the, The placement of the pipes for the electrical piping should be done once this grid is finished, the exact placement of the lower boxes should be traced in the formwork., notes, steel, concrete, formwork, electric tubing, Specifications, general details specifications

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units
Footprint Area
Building Features
Tags , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT