ADVERTISEMENT
ADVERTISEMENT
Tuneles Hydroelectric Power System DWG Section for AutoCAD
Construction of Hydroelectric involves the excavation of caverns; very important section; for the installation of the turbines and transformers; and numerous tunnels dedicated to the transport of water to the turbines and their subsequent integration into the beds of nearby rivers. The extreme complexity of excavations associated with underground stations must make HYDROELECTRIC POWER AND WATER TRANSPORT CAVE OF THE CENTRAL CHEVES (PERU). By the tense calculations – dimensional deformational can be addressed with accurate design of the support of the most complex caves evaluating the interaction between the caverns turbines and transformer .
Language | Other |
Drawing Type | Section |
Category | Industrial |
Additional Screenshots | |
File Type | dwg |
Materials | |
Measurement Units | Metric |
Footprint Area | |
Building Features | |
Tags | autocad, bergbau, bohr, construction, drilling, DWG, excavation, hydro, hydroelectric, important, installation, involves, l'exploitation minière, le forage, mineração, mining, perfuração, power, section, system, transformers |
ADVERTISEMENT