ADVERTISEMENT

ADVERTISEMENT

Well Mechanical DWG Detail for AutoCAD

CONSTRUCTION DETAILS – SPECIFICATIONS

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Control shed, Process tube, galvanized sheet, Flatbed foundations, scale:, DC, House columns, scale:, cimentacion plant, both senses, Crown corona, Roofing house, scale:, slab, Crown sole, Middle floor, Water heater, Block pomez, Roofing house, scale:, Reinforcement foundation est, Block pomez cm resistance, Esera floor, Block pomez cm resistance, Pipe post process of separation meters, Galvanized mesh lime with height hole, Wear lashes, Perimeter wall detail, scale:, irons, its T. M., scale, column, scale, Sill intermedia block, irons, its T. M., scale, column, Process tube, irons, its T. M., scale, Cc running foundation, Seal at the exit of the well. Pumping facilities., scale, natural terrain, Circulation of the property with mesh of meters to see detail., In the whole interior of the irrigation piedrin to avoid that the weed grows, Ground of, The type of drilling will be rotated with circulation of bentonite fluids., Estimated depth of feet, Cloak freactico, Estimated depth of feet, Drilling profile, unscaled, Walls between cladding stuffed with granular piedrin, Submersible pump with hp single-phase motor, Filter gravel walls between cladding filled with graduated stone, Jacketed with black carbon steel tubing astm grooved in the spaces where the rock layers, Drill bits: to grind the floor three types will be used: tricone tooth hammer buttons background. Each one must be used to change according to the formation found to increase the drilling speed, Location of the pump, unscaled, Development cleaning: by means of a mechanical procedure the well of the waste of the same as the solids that are introduced in the same. If required, non-phosphate dispersants which do not affect the environment are used. Pumping test: Determine your water levels your static level Dynamic level. Do it for a period of hrs. Rumbas: make samples each feet for hydrogeological analysis. Sanders: in order to remove the sand from the fluids, avoiding the sealing of open spaces in the subsoil, the flow of groundwater towards the well. Bentonites: it will be a natural clay for the formulation of the fluids of have to have suitable properties of viscosity pemitiendo one of cuts makes a perforated hole stable. Electrical register: through a probe will measure the resistivity of the formations of the processing of the information by means of the report will allow the arrest of formations conducive to groundwater so to properly install the grid in the structure of the well., Control shed, Well sanitary seal, Cedar hg pipe, To the storage tank, Plant pumping facilities, scale, Concrete cyclopeo: of clean stone of no greater cm. Of concrete in the proportion with a resistance expected the days of the concrete for slabs will be of the same proportion indicated above. All covering in slabs beams will be in shoes parts with exposure will be cm. The reinforcing steel will be to a minimum degree for the concrete to be tested in accordance with the astm standards for testing concrete steel materials. The folds overlaps will be in the minimum ranges that indicates the code of the concrete accepted in the means, The pump will be with diameter of motor of two the protection equipment will be composed by: protectors of lightning arrester relays, door of, Sidewall of each cast around the construction, Sisado block walls, Reinforced concrete slab, Controlhouse elevation, scale, both senses, irons, bed, irons, its T. M., irons, its T. M., irons, its T. M., scale, Water heater, scale, Foundation, scale, Sides, Crown corona, scale, Armed with shoe

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply