Xopanapa Road Project DWG Full Project for AutoCAD
Remodeling Xopanapa Road, located in Teopancingo; municipality Huauchinango;Puebla
Drawing labels, details, and other text information extracted from the CAD file (Translated from Galician):
sct, puebla, west, east, south, north, pantheon, date :, way :, boss of ofna. of project of., check :, xopanapa – teopancingo, public works, section :, type :, project :, head of the dpto. est. and project, length :, authorize :, no.bo., no. exp., technical director, undersecretary of communications, validated project, rural, project speed, type path, corona width, folder width, maximum curvature, maximum slope, governor slope, base base lower thickness, characteristic concepts of section on this unit plane, material produced by the material cuts produced by the loans, levanto :, drawing :, calculation:, honorable municipal council, mampo-, demolition-, board for comp-a, masonry, concrete, cions, iron reinforcement, structural steel, steries, zampeado, tubes, mass, cyclopeo, amounts of work, works of art, nes, excavation-, steps, despalme, sides, inside of, bank, the strip of, loans, total, geometric In the loan, wasted mat, mat aprovechado, curvamasa, depto. of public works, of huauchinango, pue., h. a. m h., scales, terraces, specifications of the project, terraple rior, of the expansion of, bre mate. not comp., from the filling to, to form a layer of su-, sewn in cuts, existing ceilings, the crown on the ground -, built-in, – of the top layer, slopes on the ground -, of the laying of, -, of elevations su-, formation and compactación, bandeado, voltajeo, espesor, corte, subrasante, terreno, elevacion, clasif. geological, variability vol., ordered from the, curve mass, embankment, volume, road office, check the head of the office, section: xopanapa-teopancingo, the head of the department the general director, check the representative of the sctep, origin of the cadenade: xopanapa, mpio. of Huauchinango, p., disassemble for density, cuts and adic, of cuts, expansion, slope, downfall, downholes, recesses, crown of, cuts, excavations, geometry in excavation, wasted mat, approved mat, vo. Well, the brigade chief, with or without a wedge, of refining, of the bed of, of embankment, of the land, natural in the, the cuts, terraces, existing, area of desplante, existing, of pavement, terraplenes , compaction, plant and profile, of the town state, project department, communications and transport secretary, sctep, carriage, overload, excavation, curve number, intersection point, angle of deflection, degree of curvature, radius of curvature, subtangent, curve length, curve principle, tangent principle, pi number, padlock, lock km. closed, sections of construction
Raw text data extracted from CAD file:
Language | Other |
Drawing Type | Full Project |
Category | Roads, Bridges and Dams |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Masonry, Steel, Other |
Measurement Units | Metric |
Footprint Area | |
Building Features | |
Tags | autocad, DWG, full, HIGHWAY, located, municipality, pavement, Project, remodeling, Road, route |