Addition Of Neutral Line DWG Block for AutoCAD
Neutral line is installed to land an underground circuit half voltage in the city Comitan de Dominguez Chis ( Power lines)
Drawing labels, details, and other text information extracted from the CAD file (Translated from Galician):
Pole, Est., No, Devices, Device box, Series, No, M. T., B. T., It exists, The m.t. It will be in acsr kv, With neutral thread running acsr, Knock on it, The b.t. It will be neutron at. Lime, Medium tension summary, Relationship of posts, Total pcs, Pzas, Neutral thread acsr km., The m.t. In acsr km., Low tension summary, The b.t. In neutron at. Lime Km., Operating voltage kv., Kva pza transformer, Protected in m.t. B.t. In, The transformers to install are:, M. T. Existing, Fuse circuit breaker kv, Earth system, M. T. Project, B. T. Project neutral cable, Existing transformer, Retained anchor, Two retained with an anchor, Take them apart, Post project, Existing pole, Ccf shots kv, Project beneficiary, Neutral thread running, It exists, It exists, It exists, It exists, It exists, It exists, It exists, It exists, Relocation of existing pole: pzas, Transformer project, B. T. Existing naked cable, Retained pole post, Extension of electricity distribution network, Ejido Marquis de Chiapas, North, Exists b.t. In, Kva, Exists c.o.g., Kva, Kva, Kva, Central west, Lic. Benito juarez, South west, Av., South west, South west, Av. West, South, South west, Av. South west, Av., Boulevard, Belisario, South west, Av. South west, South, West, South, West, South west, West, South west, Av. West, Dominguez sur, Av. Central, Prof. Reynaldo, Avendaño, Av., West, South west, Kva, Kva, Exists c.o.g., Kva, Exists b.t., Copper, Kva, Exists b.t., Acsr no, Kva, Kva, Kva, Kva, Exists b.t., Acsr no, Exists b.t., Acsr, Exists b.t., Acsr, Exists b.t., Acsr, Kva, Kva, Kva, Kva, Exists b.t., Acsr, Exists b.t., Acsr, Exists b.t., Acsr, It exists, Acsr no, Exists b.t., Copper, Exists b.t., Neutranel lime, Exists b.t., Neutranel lime, Exists b.t., Neutranel lime, Exists b.t. Acsr, Copper wire no, Exists b.t. Acsr, Copper wire no, Exists b.t. Copper no, Acsr thread, Kva, Cut, Cut b ‘, Copper no, Substation, Of power, Commit, South west, Av. West, Av. German miguel, Jimenez, Hidalgo, Reform, Pantaleon, Dominguez, Aldama, Zaragoza, Hidalgo, Belisario, Dominguez, Gutiérrez, Av. Agustin, Garcia, Beyond, Maria elena, September, October, November, May, The, Laurels, Central, Commit, The, Cypresses, Abasolo, Camellon, International highway, Colonel Grajales, Axis pte. South, Exists b.t, Kva, Acsr no, Kva, Exists b.t, Exists b.t, M.t exists, In acsr nº, Kva, Exists b.t, Kva, Cut to ‘, Cut, Exists b.t, Acsr no, Exists b.t, The federal commission of electricity division area San Cristobal certifies to have reviewed authorized the present project of air line of average tension with validity of a year from the one of, Ing Abel aragon chavez superintendent of san cristobal area, Ing Jose diaz molina chief of the planning department, Ing Jose luis hernandez cowboy chief of the distribution department, Note: this approval is not authorization for the work can be executed until the corresponding work agreement has been formalized., Federal commission of electricity, Southeast division san cristobal area, Plan: project, Flat no., Project of addition of cable wire acsr like neutral thread running from substation to commission center for the underground wiring work of the r.d. Of electric energy of av. They commit from chiapas., Neutral addition plane, Scale:, Date: August, Flat: from, Authorized:, Checked:, Good seen:, Project:, The federal commission of electricity division area San Cristobal certifies to have reviewed authorized the present project of air line of average tension with validity of a year from the one of, Ing Abel aragon chavez superintendent of san cristobal area, Ing Jose diaz molina chief of the planning department, Ing Jose luis hernandez cowboy chief of the distribution department, Note: this approval is not authorization for the work may be executed until the corresponding work agreement has been formalized., Federal commission of electricity, Southeast division san cristobal area, Plan: project, Flat no., Project:, Project of addition of cable wire acsr like neutral thread running from substation to commission center for the underground wiring work of the r.d. Of electric energy of av. They commit from chiapas., Neutral addition plane, Scale:, Date: August, Flat: from, Authorized:, Checked:, Good seen:, The federal commission of electricity division area San Cristobal certifies to have reviewed authorized the present project of air line of average tension with validity of a year from the one of, Ing Abel aragon chavez superintendent of san cristobal area, Ing Jose diaz molina chief of the planning department, Ing Jose luis hernandez cowboy chief of the distribution department, Note: this approval is not authorization for the work may be executed until the correspo corresolation agreement has been formalized
Raw text data extracted from CAD file:
Language | N/A |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | addition, alta tensão, autocad, beleuchtung, block, circuit, city, de, détails électriques, detalhes elétrica, DWG, electrical details, elektrische details, haute tension, high tension, hochspannung, iluminação, installed, kläranlage, l'éclairage, la tour, land, lighting, line, torre, tower, treatment plant, turm, underground, voltage |